Site work for a water / sewer project in Lake Geneva, Wisconsin. Completed plans call for site work for a water / sewer project.

The work includes the completion of a 200,000-gallon spheroid elevated water storage tank with a high-water level of 125 ft. 9 in. located on Wild Ridge Dr. in Lake Geneva, Wisconsin. Exterior work involves high pressure water cleaning (5,000 to 10,000 psi) and spot power tool cleaning to a SSPC-SP11 standard with the application of a three-coat epoxy urethane fluoropolymer system. Wet interior requires abrasive blast cleaning to a SSPC-SP10 near-white metal standard and a three-coat zinc epoxy system. The dry interior requires abrasive blast cleaning of the tops of platforms, the entire transition cone, and spot coating failures to a SSPC-SP6 standard, with a three-coat epoxy system on the transition cone and a spot two-coat epoxy system elsewhere. The foundation is to be water cleaned and coated with a two-coat epoxy system. Cathodic protection work includes replacement of wet interior components and attachment points, with reuse of the existing rectifier and pressure fitting. Repairs include: replacing the access tube manway gasket, installing a gasket on the wet interior roof hatch, replacing the mud valve, replacing the condensate drain line, replacing the fall prevention device on the wet interior ladder, replacing the overflow screen, replacing the roof vent with a pressure vacuum vent, installing a roof painter's railing, installing kickers on the roof handrail and antenna cable brackets, replacing the aviation light, and replacing the dry interior light bulbs. Question Deadline 01/06/2026 Interpretations or clarifications considered necessary by DIXON and in DIXON sole judgement, in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for the opening of Bids may not be answered. Bidders are instructed to refer to the Instructions to Bidders and any Supplemental Instructions to Bidders for requirements regarding bid submittal, qualifications, procedures, and contract award. Prequalification of contractors will be reviewed and determined by Dixon Engineering. Contractors with projects in dispute or unfinished due to contract problems will not be prequalified. Complete digital project bidding documents are available for a non-refundable fee by inputting the project number on the specified website. The contractor is to adhere to the specified work hours and completion schedule, including a maximum tank out-of-service period, with liquidated damages applicable for schedule overruns. Special damages, fines, or set-offs may also apply per the bid/agreement form.

Bid Results

Water / Sewer

$200,200.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

22

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
4
Bidding Soon
2,812
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2026

June 1, 2026

Project location map

Wild Ridge Dr, Lake Geneva, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.