BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 6, 2026 at 7:00 PM

Updated February 7, 2026

Demolition, site work, paving and new construction of a bridge / tunnel in Townsend, Georgia. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Georgia DOT is seeking to contract with a Design-Builder to provide services necessary - for the design and construction of a new bridge approximately 1,441-foot-long, 55-foot-wide offset 40 feet west of the existing alignment along SR 25/US 17/SR 99/N. Walton Street at the Darien River. The project will maintain two-lane, two-way traffic during construction by first building a portion of the new bridge, shifting traffic to it, then demolishing the old bridge and completing the remaining span. The corridor covers approximately 0.5 mile and includes a shared-use path and sidewalk (the Project). This Project will be awarded to a Design-Builder utilizing a Two-Phase Best Value method. A Design-Builder includes a Lead Contractor and a Lead Design Consultant working together to design and construct the project. The Georgia Department of Transportation (Georgia DOT) hereby posts the following Public Notice Advertisement (PNA) for considered services. Georgia DOT intends to solicit responses for services to design and construct a new bridge approximately 1,441-foot-long, 55-foot-wide offset 40 feet west of the existing alignment along SR 25/US 17/SR 99/N. Walton Street at the Darien River. Located in McIntosh County, Georgia. Georgia DOT is seeking to contract with a Design-Builder to provide services for the design and construction of a new bridge approximately 1,441-foot-long, 55-foot-wide offset 40 feet west of the existing alignment along SR 25/US 17/SR 99/N. Walton Street at the Darien River. The project will maintain twolane, two-way traffic during construction by first building a portion of the new bridge, shifting traffic to it, then demolishing the old bridge and completing the remaining span. The corridor covers approximately 0.5 mile and includes a shared-use path and sidewalk (the Project). Georgia DOT reserves the right to adjust the schedule as it deems necessary.

GC Bidding

Bridges / Tunnels

$20,000,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
59
Bidding Soon
769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 19, 2026

October 19, 2026

Project location map

GA-25, Townsend, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.