BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 12, 2026 at 8:00 PM

Updated March 13, 2026

Site work for a development in Aurora, Illinois. Completed plans call for site work for a development.

The City of Aurora, IL is seeking a qualified contractor to restore the Mastodon Lake Shoreline. This project includes shoreline restoration of 23-acre Mastodon Lake using native vegetation, stone and bio-engineered techniques all in accordance with the plans and specifications. Phillips Park is considered the jewel of the community. Mastodon Lake, which is in Phillips Park, provides stormwater detention and is used by boaters, anglers and bird watchers and admired by park visitors. However, the Lake has developed an issue with excessive aquatic vegetation which is reducing the aesthetic appeal and negatively impacting the water quality of the Lake. The success of this project is highly dependent upon the manner in which the restoration and maintenance is completed. A firm or person who is a qualified ecologist who is familiar in shoreline and wetland restoration and native vegetation is necessary to ensure that the project is successful. The successful bidder will have a qualified ecologist, who has knowledge in native prairie restoration, on staff as a direct employee. A resume for the ecologist must be submitted with the bid application. The ecologist must oversee all shoreline grading, stone installation, seeding, perennial and shrub planting and supervise the maintenance of the native vegetation for conformance with the contract documents and specifications for the full maintenance period. Failure to provide required qualifications may result in disqualification of the bid at Owner's discretion. Since the City has also published a separate bid for dredging of the lake, the awarded contractors may be required to work concurrently onsite.. The site visits each year shall be conducted between May 1 and October 30. The City of Aurora, IL is seeking a qualified contractor to restore the Mastodon Lake Shoreline. The project consists of restoring the shoreline of the 23-acre Mastodon Lake using native vegetation, stone, and bio-engineered techniques in accordance with provided plans and specifications. The contractor should be a qualified ecologist familiar with shoreline and wetland restoration and native vegetation to ensure the project's success. QA Deadline date change from 01/09/2026 to 01/15/2026 as per addendum 2 Question Deadline 02/25/2026 at 11:00 AM CT Bidders shall submit all inquiries, including requests for alternates or substitutions regarding this bid, up to, but no later than the designated date and time as specified via Online.

Bid Results

Conservation and Development

$526,183.00

Public - City

Site Work

22

5

16

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
589
Active Projects
255
Bidding Soon
3,344
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 11, 2026

April 10, 2026

Project location map

1000 Ray Moses Dr, Aurora, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.