BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 27, 2025 at 7:00 PM

Updated December 29, 2025

Site work for a development in Manteo, North Carolina. Completed plans call for site work for a conservation development.

Question Deadline 01/14/2026 Submit questions via pdf document emailed to Engineer at Patrick@coastalscience.com and ccd to Owner at Dustin.Peele@DareNC.gov. The Project includes the following Work: Beach nourishment along ~4.5 miles of shoreline along portions of the Cape Hatteras National Seashore in front of the Village of Avon and Village of Buxton. Work will include placement of up to three million (3,500,000) cubic yards (cy) of sand sourced from approved borrow areas offshore of each placement area in North Carolina state waters. Placement includes 1.3-2 million cy of sand placed along Buxton and 300,000-1,000,000 cy at Avon. A significant portion of the work is contingent on approval of federal funds through FEMA; therefore, the Owner is requesting Bids for a scenario excluding FEMA funds (Bid A) and a scenario where FEMA funds are included (Bid B). Work shall be completed in accordance with state and federal permit conditions for the project, with final completion by December 31, 2026. Dare County is preparing a solicitation for bids for the placement of up to 3.5 million cubic yards of sand along portions of the Cape Hatteras National Seashore in front of the Village of Avon and the Village of Buxton. The distribution of the beach fill includes up to 1 million cubic yards of sand along approximately 2.5 miles of shoreline in front of Avon Village, and up to 2.5 million cubic yards of sand along approximately 2.9 miles of shoreline in front of Buxton Village and the National Seashore. The project will utilize sand from two offshore borrow areas located approximately 2-3 miles off Avon and Buxton within North Carolina state waters. These borrow areas contain a total of 7.7 million cubic yards of beach quality sand. Only bidders who attend the mandatory pre-bid meeting will be eligible to bid on the project. Dare County reserves the right to reject any and all bids in accordance with NC General Statutes.

GC Bidding

Conservation and Development

$35,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
44
Bidding Soon
469
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 21, 2026

April 1, 2026

Project location map

Multiple Locations, Manteo, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.