BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 3, 2026 at 7:00 PM

Updated March 4, 2026

Site work for a water / sewer project in Union Beach, New Jersey. Completed plans call for site work for a water / sewer project.

The scope of work generally includes the following at the Primary Sludge Pump Station No. 1 (PSPS #1) within the BRSA Wastewater Treatment Plant, located at 100 Oak Street, Union Beach, NJ 07735: Replace existing MCC and lighting panelboard and refeed all existing loads from new equipment. Replace electrical feeder from the existing main distribution switchboard to the new MCC. Provide new power monitoring system connected to the SCADA system. Provide temporary standby generator to maintain plant operations at all times. Question Deadline 01/22/2026

Award

Water / Sewer

$300,000.00

Public - City

Site Work

12

10

4

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
278
Active Projects
27
Bidding Soon
4,573
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

March 9, 2026

Project location map

100 Oak St, Union Beach, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.