Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 11, 2026 at 8:00 PM
Updated May 15, 2026
Site work for a water / sewer project in Juneau, Alaska. Working plans call for site work for a water / sewer project.
The project consists of a Design-Build recapitalization and modernization of the existing waterfront and supporting infrastructure at USCG Station Juneau to support the homeporting of USCGC STORIS and visiting cutter classes. Work generally includes demolition of the existing aging waterfront wharf and support facilities, construction of a new wharf to support at least one cutter berth, and construction of a new floating pier system supporting multiple cutter berths. The scope also includes installation of fender systems and mooring infrastructure, shore power and electrical system upgrades, potable water, sewer, fire protection, and communications systems, backup power, site-wide utility distribution, and associated civil and site improvements. Optional work may include building renovations, a covered floating small boat facility, dredging, and additional facility upgrades. The project will be executed in an active, 24/7 operational Coast Guard environment requiring continuous mission operations, temporary utilities, access, and mooring systems, and careful coordination of marine logistics, environmental permitting, and seasonal construction windows. Design and construction must address extreme tidal variation, high wind events, seismic requirements, cold-region construction conditions, corrosion exposure, and heavy cutter berthing and mooring loads. A site walk is planned to allow industry participants to observe existing conditions and support constructability and execution planning. ESTIMATED MAGNITUDE OF REQUIREMENT: The estimated magnitude is more than $100 million in accordance with FAR 36.204. More precisely, the Government estimates the full DB requirement, inclusive of all options, to be between $125 million to $200 million The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Final Planning
Water / Sewer
$200,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
