BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a water / sewer project in Juneau, Alaska. Working plans call for site work for a water / sewer project.

The project consists of a Design-Build recapitalization and modernization of the existing waterfront and supporting infrastructure at USCG Station Juneau to support the homeporting of USCGC STORIS and visiting cutter classes. Work generally includes demolition of the existing aging waterfront wharf and support facilities, construction of a new wharf to support at least one cutter berth, and construction of a new floating pier system supporting multiple cutter berths. The scope also includes installation of fender systems and mooring infrastructure, shore power and electrical system upgrades, potable water, sewer, fire protection, and communications systems, backup power, site-wide utility distribution, and associated civil and site improvements. Optional work may include building renovations, a covered floating small boat facility, dredging, and additional facility upgrades. The project will be executed in an active, 24/7 operational Coast Guard environment requiring continuous mission operations, temporary utilities, access, and mooring systems, and careful coordination of marine logistics, environmental permitting, and seasonal construction windows. Design and construction must address extreme tidal variation, high wind events, seismic requirements, cold-region construction conditions, corrosion exposure, and heavy cutter berthing and mooring loads. A site walk is planned to allow industry participants to observe existing conditions and support constructability and execution planning. ESTIMATED MAGNITUDE OF REQUIREMENT: The estimated magnitude is more than $100 million in accordance with FAR 36.204. More precisely, the Government estimates the full DB requirement, inclusive of all options, to be between $125 million to $200 million The Method of Contractor Selection has not been determined at this Time. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Final Planning

Water / Sewer

$200,000,000.00

Public - Federal

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2027

Project location map

345 Egan Dr, Juneau, AK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.