Site work for a power facility in Miami, Florida. Completed plans call for site work for a power facility.
Project name: Electrical Service Design for Site Utility Relocation at the Resource Recovery Facility. The project involves re-energizing several sites within the Resource Recovery Facility grounds due to the impending demolition of the existing power plant, which currently supplies power to all systems. A new electrical service from FPL is required, either from 97th Avenue or 66th Street. The contractor shall coordinate the primary connection with FPL. The total estimated power requirement for the entire system is approximately 1,200 amps at 480 volts. The contractor shall coordinate a new FPL electrical service to the site, including all necessary plans, documentation, and permits, and distribute power from the new service point to multiple facility locations, each requiring 480 volts (Lift Station No. 938: 400-amp connection; Transportation Trailer: approximately 400 amps; Scale Houses No.1 & No.2 & Security Station: combined 200 amps; Reworld Maintenance Building: temporary power as needed, 250 amps). All work must comply with FPL standards and local electrical codes. The system must ensure reliable and safe operation of all connected facilities. The contractor must coordinate with Reworld, FPL, and County personnel to establish temporary power requirements and ensure that installation work does not affect plant operation. Prime Contractor is highly preferred to have completed five previous projects similar in nature, size, and extent in the last five years and demonstrate full-time personnel with the necessary experience. Proof of experience documentation must accompany bid submittal. Any prior experience of the Prime Contractor's key personnel will also be considered. The Prime Contractor must be able to pull a master permit. This project involves re-energizing several sites within the Resource Recovery Facility grounds due to the impending demolition of the existing power plant, which currently supplies power to all systems. A new electrical service from FPL is required, either from 97th Avenue or 66th Street. Contractor shall coordinate the primary connection with FPL. Electrical Power Requirements: The total estimated power requirement for the entire system is approximately 1,200 amps at 480 volts. This represents the combined demand for all sites within the facility to be energized. Electrical Power Distribution for Site Re-Energization The contractor shall be responsible for the following: o Coordinate a new FPL electrical service to the site from either 97th Avenue or 66th Street, including all necessary plans, documentation and permits. FPL contacts will be given to the awarded contractor. o Distribute power from the new service point to the following locations, all requiring 480 volts: a) Lift Station No. 938: Provide a 400-amp connection. b) Transportation Trailer (North Side of Building): Provide approximately 400 amps, 480 Volts of power. c) Scale Houses No.1 & No. 2 & Security Station (at plant entrance): Provide a combined 200- amp, 480 Volts connection. d) Reworld Maintenance Building: Provide temporary power as needed. (250 amps at 480 Volts) DEADLINE FOR RECEIPT OF RFI QUESTIONS: By 4:00 P.M, EST., on 01/26/2026. Submit Request for Information (RFI's) to primo@miamidade.gov and gibsy.nunezdavila@miamidade.gov with copy to clerkbcc@miamidade.gov
Post-Bid
Power Plant
$766,425.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 9, 2026
April 1, 2026
6990 NW 97th St, Miami, FL
Related To This Project
Miami, FL
Bid Date: Feb 10 2026
Miami, FL
Bid Date: Mar 18 2026
Miami, FL
Bid Date: Feb 19 2026
Miami, FL
--
Miami, FL
Bid Date: Jan 30 2026
Miami, FL
Bid Date: Feb 09 2026
Miami, FL
Bid Date: Feb 25 2026
Miami, FL
--
Miami, FL
Bid Date: Jan 16 2026
Miami, FL
Bid Date: Jan 30 2026
Miami, FL
Bid Date: Feb 04 2026
Miami, FL
Bid Date: Jan 30 2026
Miami, FL
--
Miami, FL
Bid Date: Jan 23 2026
Miami, FL
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.