Published February 13, 2026 at 7:00 PM

Updated February 14, 2026

Demolition, site work, paving and new construction of a mixed-use development in Chippewa Falls, Wisconsin. Completed plans call for site work for a water / sewer project; road / highway; sidewalk / parking lot; for the demolition of a water / sewer project; for the construction of a water / sewer project; for paving for a sidewalk / parking lot; and road / highway.

In general, the work consists of: replacing the existing sanitary sewer lift station for the DHS Northern Wisconsin Center in Chippewa Falls, Wisconsin. Site work will include removal of existing package lift station, construction of a new submersible lift station, new gravity sewers, manholes and force main piping. paving, grading, seeding, and erosion control. All potential bidders must be certified by DOA prior to submitting bids on state construction projects over $100,000. Base Bids will be received as a single lump sum bid for: 5) Electrical. This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening. DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. NOTICE: The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. Event bid date notes : Hand delivery to the drop box labeled sealed bids only in front of the state of Wisconsin Administration Building located at 101 East Wilson Street, Madison, Wisconsin 53703.

Post-Bid

Water / Sewer

$630,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

24

23

4

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
74
Bidding Soon
532
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 11, 2026

March 13, 2026

Project location map

2820 E Park Ave, Chippewa Falls, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.