BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 27, 2026 at 7:00 PM

Updated February 28, 2026

Site work and paving for a bridge / tunnel in Bowne Township, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000408857 Bid Intent Optional Bid Intent Deadline 02/03/2026 08:30 AM EST Locations: Bowne Bridge #22 - Freeport Ave over Duck Creek Completion Date: October 2, 2026; See Progress Clause for further details Buyer Preferences, Guidelines & Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % The Board reserves the right to reject any and all bids or to waive irregularities therein, and to accept any bids which, in the opinion of the Board, may be most advantageous and to the best interest of the County Mobilization, _Structural Steel Anode _Drilled Shear Stud, Type A, 3/4 inch _Drilled Shear Stud, Type B, 3/4 inch Substructure Horizontal Surface Sealer Beam Plate, Seal Perimeter Steel Structure, Cleaning, Steel Structure, Coating, Barricade, Type III, High Intensity, Double Sided, Lighted, Furn Barricade, Type III, High Intensity, Double Sided, Lighted, Oper Plastic Drum, Fluorescent, Furn Plastic Drum, Fluorescent, Oper Sign, Type B, Temp, Prismatic, Furn Sign, Type B, Temp, Prismatic, Oper Sign, Type B, Temp, Prismatic, Spec, Furn Sign, Type B, Temp, Prismatic, Spec, Oper _Minor Traf Devices,

Award

Bridges / Tunnels

$172,601.00

Public - County

Paving, Site Work

13

3

5

Subscribe For Documents

57 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2026

March 5, 2026

Project location map

Freeport Ave, Bowne Township, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.