Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 13, 2026 at 7:00 PM
Updated January 14, 2026
Site work for a development in Hood River, Oregon. Conceptual plans call for site work for a development.
The confederated tribes of warm springs is soliciting proposals from professional engineering firms to complete surveying, conceptual design, hydraulic analysis for baseline and proposed conditions. Basis of Design Report, Construction Budget and Construction Oversight for a Habitat Enhancement Project on Lower Tony Creek, a Tributary of the Middle Fork John Day River. The Project Area is Located on Private Timberland in Hood River County, Oregon and is Immediately Downstream of a 2023 Fish Passage Project. Project Management Will Be Provided by the Confederated Tribes of Warm Springs (Ctws), in Partnership With the Hood River Watershed Group (Hrwg), and the Bonneville Power Administration (Bpa). Design Standards, Methods, and Related Reports Must Adhere to Bpa Habitat Improvement Program (Hip) Programmatic Permit Requirements and All Other Required State, Federal and County Permits. The project is anticipated for construction in summer of 2027, pending implementation funding. Permit-level (60%) design drawings should be completed. And final drawings and specifications by November 1, 2026. The method of Contractor Selection has not been Determined at this time. "Requests for proposals for design services is underway."
Conceptual
Conservation and Development
$200,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 12, 2026
To be determined, Hood River, OR
Related To This Project
Hood River, OR
Bid Date: Feb 27 2026
Hood River, OR
--
Hood River, OR
Bid Date: Dec 18 2025
Hood River, OR
Bid Date: Nov 11 2025
Hood River, OR
Bid Date: Oct 17 2025
Hood River, OR
Bid Date: Aug 06 2025
Hood River, OR
Bid Date: Aug 04 2025
Hood River, OR
Bid Date: Jun 24 2025
Hood River, OR
Bid Date: Jun 06 2025
Hood River, OR
--
Hood River, OR
Bid Date: May 13 2025
Hood River, OR
Bid Date: Mar 12 2025
Hood River, OR
Bid Date: Feb 13 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
