BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 25, 2026 at 8:00 PM

Updated March 26, 2026

Site work, paving, remodeling and renovation of a mixed-use development in Burlingame, California. Completed plans call for the remodel of a 1,726-square-foot fire / police facility; for the renovation of a fire / police facility; for site work for a fire / police facility; for paving for a fire / police facility; sidewalk / parking lot; and sidewalk / parking lot.

Project Type Bid Response Types Line Items Bid Bond Proposal Packet - Submit with Bid (required) CARB Compliance Certificate - Submit with Bid (required) Type of Award Lump Sum. License Requirements The Contractor shall possess a Class A or B license prior to submitting a bid. The Contractor shall pay to the City of Burlingame liquidated damages in the amount of $1,900 per day for each day and every calendar days' delay in finishing the work in excess of the number of days (80 working days). Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%. Deadline 01/27/2026 2:00 PM (PST) Online Q&A Yes. Any questions regarding this project should be submitted through the online. Answer will be made available online. An online meeting link will also be provided to contractors that cannot attend in person. Contractors shall email jawoo@burlingame.org to request the online meeting link. An optional site visit will be held immediately after the pre-bid meeting. Technical Support: In the event you encounter technical difficulties during the uploading process, please contact the PlanetBids team as shown below (Mon-Fri from 5 A.M. to 5 P.M.): support@planetbids.com or call 818-992-1771, ext. 0 The work consists of remodeling existing toilet rooms, drinking fountain, interior ramp, doors, breakroom sink, and reception counter to make them ADA Compliant. Converting (E) sally port to a gym with patio. Work includes removing existing non-bearing walls, doors, millwork, plumbing fixtures and light fixtures, and building new non-bearing walls, providing new doors/frames/hardware, providing new light fixtures, modifying plumbing and providing new plumbing fixtures, and providing new millwork. It also involves modifying an existing interior ramp, and exterior concrete work for the ramp and patio at the new gym (sally port) at the Burlingame Police Department.

Award

Fire / Police

$799,058.00

Public - City

Paving, Remodeling, Renovation, Site Work

29

20

107

6

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
9
Bidding Soon
1,529
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

1111 Trousdale Dr, Burlingame, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.