Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 6, 2026 at 7:00 PM
Updated February 7, 2026
Site work for a development in Clinton, Iowa. Completed plans call for site work for a development.
The Frog Hollow Wetland Restoration Project involves the construction of a wetland between 11th Avenue South and Manufacturing Ditch. The engineer's estimate for the project is $866,561.85. The contract duration is 110 working days. The low bidder is required to return the signed contract and bond, and must sign a statement to comply with the City's Safety Manual. Frog Hollow Restoration Project work will include but is not limited to the following improvements for a stormwater wetland on the south side of the 1500 block of 13 Avenue S: A total of approximately 16,689 cubic yards of stormwater wetland earthwork, 4.1 acres of native wetland seeding, 111 linear feet of 36-inch CMP stormwater sewer extension, stormwater wetland outlet, 111 square yards of HMA pavement patch, storm drainage improvements, striping, testing, mobilization, traffic control, erosion control, and surface restoration are required, including miscellaneous work and cleanup. Plans and specifications shall be interpreted by Engineer. QA date :- 02/06/2025 at 12PM
GC Bidding
Conservation and Development
$1,053,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 10, 2026
March 6, 2026
13th Ave S, Clinton, IA
Related To This Project
Clinton, IA
Bid Date: Feb 10 2026
Clinton, IA
Bid Date: Feb 10 2026
Clinton, IA
Bid Date: Feb 17 2026
Clinton, IA
Bid Date: Feb 17 2026
Clinton, IA
Bid Date: Feb 17 2026
Clinton, IA
Bid Date: Feb 20 2026
Clinton, IA
Bid Date: Feb 10 2026
Clinton, IA
Bid Date: Feb 10 2026
Clinton, IA
Bid Date: Feb 10 2026
Clinton, IA
Bid Date: Feb 10 2026
Clinton, IA
Bid Date: Jan 23 2026
Clinton, IA
Bid Date: Jan 13 2026
Clinton, IA
Bid Date: Jan 13 2026
Clinton, IA
Bid Date: Jan 13 2026
Clinton, IA
Bid Date: Dec 03 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
