Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 18, 2026 at 7:00 PM
Updated March 4, 2026
Site work for a water / sewer project in Gifford, Illinois. Completed plans call for site work for a water / sewer project; water / sewer project; and water / sewer project.
Wastewater Treatment Plant Improvements The work includes installation of a new manual basket screen structure, refurbishment of lagoon cell #1 level control structure, refurbishment of lagoon cell #2 level control structure, new replacement blowers, refurbishment of existing sand filters, and miscellaneous valve replacement. Instructions to bidders include the following: - Obtain bidding documents from the designated website. - Submit bids including all required documentation by the specified date and time at the indicated location. - Bid security in the amount of five percent (5%) of the maximum bid price must accompany the bid. - Bids must be submitted in a plainly marked package and late submissions will not be accepted. - Bidders must acknowledge receipt of all addenda on the Bid Form. - Evidence of authority and qualification to do business in the state must be included or covenanted to be obtained before contract award. - Bids will be evaluated and awarded to the responsible bidder submitting the lowest responsive bid, with the Owner reserving rights to reject any or all bids. - Compliance with federal and state requirements is mandatory, including the Davis-Bacon Act, Employment of Illinois Workers on Public Works Act, Illinois Works Jobs Program Act, Build America, Buy America Act, and specified affirmative efforts for disadvantaged business enterprises. - Refer to the Instructions to Bidders in the bidding documents for further requirements regarding bid submittal, qualifications, procedures, and contract award. MBE (7.8%), WBE (6.9%) Completion- 365 days Question Deadline 02/24/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing . Questions received less than seven days prior to the date for opening of Bids may not be answered.
Post-Bid
Water / Sewer
$5,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 3, 2026
May 4, 2026
104 East Center Street, Gifford, IL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
