BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 6, 2026 at 7:00 PM

Updated May 21, 2026

Renovation of an educational facility in Melrose, Massachusetts. Completed plans call for the renovation of a educational facility.

Question Deadline 02/25/2026 Bidders requiring clarification or interpretation of the Contract Documents shall make a written request to the Architect. The Architect will answer such requests if received seven (7) calendar days before the date for receipt of the bids. All questions shall be directed to Gienapp Architects, admin@gienapparchitects.com. A. The Work of Project is defined by the Contract Documents and includes, but is not limited to, Phase 1 & 2 work summarized as the following: 1. Demolition of existing and installation of new toilet room fixtures, plumbing piping, etc. 2. Demolition of existing and installation of new toilet room accessories, finishes, doors, toilet partitions, etc. 3. Demolition of existing and installation of new toilet room exhaust registers and supply, etc. 4. Demolition of existing and installation of new toilet room lighting fixtures, etc. 5. Creation of three new toilet rooms, including minor demolition of existing conditions and installation of new partitions, doors, fixtures etc. B. Type of Contract: Project will be constructed under a single prime contract. The project generally consists of renovations to the existing toilet rooms within the high school, including replacement of toilet room fixtures, accessories, partitions, and finishes, as well as remodeling existing storage rooms into new toilet rooms. The Work will occur over two school breaks: Phase 1 during summer 2026 and Phase 2 during summer 2027. One alternate includes the renovation of an existing bathroom and the remodel of an existing storage room into a new bathroom. The estimated cost of Phase 1 and Phase 2 of the project is $3,100,000. Project: Melrose High School Toilet Rooms Renovations. The Project generally consists of renovations to the existing toilet rooms within the High School, including replacement of toilet room fixtures, accessories, partitions, and finishes, as well as remodeling existing storage rooms into new toilet rooms. One alternate includes the renovation of an existing bathroom and the remodel of an existing storage room into a new bathroom.

Bid Results

Educational

$1,672,212.00

Public - City

Renovation

105

24

18

6

Subscribe For Documents

102 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
694
Active Projects
428
Bidding Soon
4,632
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 4, 2026

June 21, 2026

Project location map

360 Lynn Fells Pkwy, Melrose, MA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.