Renovation of an educational facility in Redmond, Oregon. Completed plans call for the renovation of a educational facility.

The Sage Elementary School and Terrebonne Community School Cooling Retrofit Projects aim to improve thermal comfort, enhance HVAC system performance, and provide dependable year-round climate control through comprehensive cooling system upgrades. At Sage Elementary School, key improvements include installing a new chiller sized to meet the cooling needs of the entire campus, implementing a chilled-water distribution system to serve all mechanical-room air handling units, and adding cooling coils at those units to ensure consistent temperature regulation. At Terrebonne Community School, the upgrades include the addition of a chilled water cooling system comprising an air-cooled chiller, pumps, and other accessories for a complete system. There will also be various split system cooling solutions for the admin, library, kitchen, and various classrooms. In addition, a new heating solution for the existing gymnasium comprising new ductwork and equipment will be installed. The selected construction manager/general contractor (CM/GC) must have demonstrated experience delivering mechanical retrofit projects on occupied K-12 campuses and will join the project team at the 100% design development stage to support preconstruction planning and ensure a smooth transition into construction. The intent is to issue separate contracts to one firm for both projects. Proposals shall provide three paper copies and one PDF electronic copy on a flash drive of their proposal in a sealed envelope. Proposals will be evaluated based on company overview, firm experience, similar project history, and other criteria identified in the RFP. The owner reserves the right to reject any proposal that is not in compliance with all prescribed requirements. The Macc for Sage Elementary is Estimated to Be $1,400,000. The Macc for Terrebonne Community School is Estimated to Be $1,400,000. Question Deadline 01/30/2026 at 2:00 PM PT Inquiries for clarification or additional information, if any, must be received Protests to the RFP, the Contract or any aspect of the selection process as set out in Section II must be received by Chris McKay, Principal | Director of Operations, at HMK Company

Post-Bid

Educational

$2,800,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
2
Active Projects
0
Bidding Soon
99
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 6, 2026

June 1, 2026

Project location map

Multiple Locations, Redmond, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.