Published February 13, 2026 at 7:00 PM
Updated February 19, 2026
Renovation of an educational facility in Redmond, Oregon. Completed plans call for the renovation of a educational facility.
The work consists of removal and disposal of the in-service steep-slope roofing assembly, replacement with new sheet metal saddles, self-adhering flashings, synthetic underlayment, installation of new continuous exterior insulation, and new asphalt composition shingles. Rehabilitation on the in-service low-slope roof assembly with a fully-reinforced liquid applied roof restoration system is also included. There is targeted stucco removal and replacement with direct-applied stucco at locations around openings where new flashing is to be installed per details. This scope does not address unforeseen structural deficiencies, mechanical systems, or other building systems not directly impacted by the proposed envelope renewals. Existing construction documents were not available; assumptions were made about the existing roofing assembly based on field observations and non-destructive moisture scanning at select areas noted in the photo appendix. Bids must be submitted on forms furnished to the bidders, in a sealed envelope plainly marked with the project name and bidder’s information. Each bid must be accompanied by an unconditional cashier's check, certified check, or surety bond in the amount of ten percent. Bid documents may be obtained from the provided website. Any objections or comments upon the bid specifications must be submitted in writing at least seven calendar days before the bid closing date. Bidders must be licensed by the appropriate board as required by state law and comply with prevailing wage rate laws. Each bid must identify whether the bidder is an Oregon resident bidder. If the contract amount exceeds $100,000, a first-tier subcontractor disclosure form is required. If any person contemplating submitting a bid for the proposed contract finds discrepancies in, or omission from, or is in doubt as to the true meaning of any part ofthe drawings, specifications or form of contract documents, they may submit to the Owner's Project Manager a written request for an interpretation thereof to be received in the office of the Owner's Project Manager no later than SEVEN (7) calendar days before bid, before 2:00 PM local time. The person submitting the request will be responsible for its delivery prior to the time of closing. PROJECT MANAGER: Darek Olson, Senior Project Manager HMK Company 916 SW 17 th Street, Suite 204 Redmond, Oregon 97756 Phone: (541) 213-7184 Email: darek.olson@hmkco.org
Post-Bid
Educational
$500,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.