Renovation of an educational facility in West Chester, Pennsylvania. Completed plans call for the renovation of a educational facility.

Sealed bids are solicited for the Henderson High School Partial Roof Refurbishment/Replacement Project. Bids must be accompanied by a Non-Collusion Affidavit and a Contractor's Qualification Statement. Bidders must submit a certified check or bid bond of 10% of the bid amount. The successful bidder will be required to furnish Performance and Payment Bonds equal to 100% of the contract price. All bidding documents are available through PennBid at no cost. Attendance at a pre-bid meeting is mandatory. Bids must remain valid for 60 days after opening and the contract is subject to prevailing wage. The School Board reserves the right to accept or reject any or all bids, waive informalities, and to make or not make awards in the best interest of the school district. The scope of work includes but is not limited to the following list of items as identified below and in the enclosed drawings. Henderson High School - Auditorium Dressing Room Roof 1.Remove existing Ballast stone and dispose of properly. 2.Provide a cold-fluid-applied polyurethane roofing/waterproofing system on structural concrete, plywood sheathing, cover board, metal or other substrates. 3.Included in the scope is to replace up to 15% of the roof area insulation, cover board, and EPDM roof membrane. Areas to be removed will be decided after the pre-construction roof scan. 4.Bidders must be manufacturer's approved installers. Submit a letter of certification from the manufacturer which certifies the roofing contractor is authorized to install the manufacturer's roofing system. A. Work shall include but not limited to; any and all demolition and removal of material, dumpsters, insulation, cover boards, cant strips, adhesives, walk pads, flashings, raising of roof curbs (if necessary), caulk, copings, coatings, etc to provide a complete and warrantied system. B. Included in the scope of work is a pre-construction and post construction roof scan. A copy of each scan will be provided to the owner. C. Final payment will not be made until the post construction scan is completed and any remediation work is completed. D. All material shall be asbestos free. E. Provide 20-yr manufacturer warranty for each area of roof included in this project scope of work. F. A 12-month contractor warranty shall be supplied for each roof section from the date of substantial completion. G. Provide all labor and materials necessary for a complete and watertight installation. 1. Upon completion of the installed work, submit copies of the manufacturer's final inspection to the Owner prior to the issuance of the manufacturer's warranty Henderson High School - Auditorium Dressing Room Roof & Auditorium Entrance Roof 1. Remove existing Ballast stone and dispose of properly. 2. Recovery Board - Mechanically attach new 1/2 " Secure Rock Cement Board over entire roof areas per the manufactures fastening schedule. Boards shall be clean, dry, dust free, and shall be properly secured to the structure. Secure loose boards if not in sound condition. Damaged or contaminated boards shall be removed or replaced. Cracks and joints between 1/4 " and 1" shall be sealed with Sikaflex sealant. Apply bond breaker tape sufficient to span width of crack or joint. Apply Sika Joint Tape SA centered over crack or joint. Apply Sika Joint Tape SA, a minimum of 2 inches on both sides of the crack or joint. 3. Prep & Prime - Clean all debris from roof surface and apply Sikalastic LowVoc Concrete Primer 300 sf/gal over recovery board. Sikaflex at all fastener heads, strip in all Secure Rock seams with 3" Sika Joint Tape SA. Sika EP Primer on all metal and dissimilar materials 250 sf/gal. 4. Sealant - SikaFlex 11 FC at angles 5. Base Coat - Sikalastic 641 @50 mils WFT (estimate maximum coverage 32 sf/gal). 6. Reinforcement - Apply Sika Fleece 120. 7. Top Coat - Sikalastic 641 @ 30 mils WFT with Fleece (estimate maximum coverage 53 sf/gal). All questions will be received through the PennBid solicitation until Thursday, January 15, 2026, at 12:00 Noon

Bid Results

Educational

$125,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

56 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
9
Bidding Soon
2,574
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 27, 2026

June 15, 2026

Project location map

400 Montgomery Ave, West Chester, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.