BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 23, 2026

Site work, paving and outdoor lighting for a mixed-use development in Saint Vincent, Minnesota. Conceptual plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Minnesota Department of Transportation plans to resurface Highway 59 from the east limits of Lake Bronson to Highway 175. The project also includes an urban reconstruct of pavement, sidewalks, storm sewer, lighting and utility improvements. A culvert located one-half mile south of Lake Bronson will also be replaced. The project is scheduled for construction in 2028. Project elements Urban Reconstruction in Lake Bronson Pavement reconstruction Sidewalk reconstruction Storm sewer reconstruction Utility improvements Culvert replacement one-half mile south of Lake Bronson Highway 59 from Lake Bronson to Highway 175 Robust resurfacing (mill and overlay) The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of January 21, 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Roads / Highways

$2,800,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
36
Active Projects
1
Bidding Soon
303
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2028

Project location map

ND-59, Saint Vincent, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.