BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 22, 2026 at 7:00 PM

Updated January 23, 2026

Paving and renovation of a civil project in Saint Paul, Minnesota. Design plans call for paving for a road / highway; and for the renovation of a bridge / tunnel.

We are planning significant improvements to Robert St. between Annapolis St. and Kellogg Blvd. Construction will be completed in multiple phases in 2027 and 2028, with some utility work in 2026. Depending on funding, most construction between Page St. and Cesar Chavez will occur in 2028 and 2029. By building the project in phases, road closures will be limited to the immediate area under construction. The project will repair or replace the roadway pavement, replace sidewalks, improve safety, and will be coordinated with other infrastructure work planned along the corridor such as utility replacement and transit improvements. We are planning for Robert St. construction to occur at the same time as work for the Metro Transit G Line to minimize disruptions to the community. Summary of work Began fall 2020: Test temporary curb extensions at the intersections of Baker St. and Robert St. and Isabel St. and Robert St. 2026: Some utility construction 2027-2028: Construction will be completed in multiple phases 2029: Viaduct construction, pending funding Complete: Repaired the George St. bridge and the viaduct between Cesar Chavez and King St. East, and repaired and resurfaced the Robert St. bridge over the Union Pacific Railroad tracks Complete: Micro-surface and restripe Robert St. between Annapolis St. (south of the Mississippi River) and 11th St. in downtown St. Paul (just south of I-94) Complete: Repair Robert St. Bridge over the Mississippi River The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of January 22 , 2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Design

Roads / Highways

$49,000,000.00

Public - City

Paving, Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
0
Bidding Soon
820
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

Robert St N, Saint Paul, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.