BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2026 at 7:00 PM

Updated February 17, 2026

Renovation of a library in North Kingstown, Rhode Island. Completed plans call for the renovation of a library.

Reference Number 0000410197 The Municipal Offices Are Open 8:30am - 4:30pm, Monday Through Friday. Please Plan Accordingly. *please Submit an Original and One (1) Electronic Copy (Thumb Drive). Question Deadline 02/11/2026 at 4:00 PM ET Questions are submitted online No . All questions are to be submitted in writing via email to: Tim McDavitt, Purchasing/Finance tmcdavitt@northkingstownri.gov . Scope, Bidding & Performance of Work The Town of North Kingstown (Owner) is seeking bid proposals from qualified Contractors for work associated with the renovation of the restrooms to the North Kingstown Public Library building. located at 100 Boone Street, North Kingstown, RI. o Review of the existing conditions. o Men's Restroom: o Remove existing tile on walls and floor o Remove all existing wall board to studs o Remove bathroom partitions o Remove PL (plastic laminate) countertop and all bathroom fixtures o Install fiberglass insulation at all walls o Install new 5/8" Green Board all walls o Floor level entire room o Provide and Install new floor drain o Provide and Install new floor tile and threshold (see specs) o Provide and Install new wall tile - full height at wet walls and 48inches in rest of bathroom (see specs) o Provide and install new PL (plastic laminate) countertop and backsplash (see specs) o Paint all walls that are not tile - prime and two coats (see paint specs) o Patch and paint ceiling as required. o Provide and Install new ADA compliant hands-free toilets and urinals fixtures o Provide and Install ADA compliant hands-free lavatories o Provide and Install new bathroom partitions o Women's Restroom: o Remove existing tile on walls and floor o Remove all existing wall board to studs o Remove bathroom partitions o Remove PL (plastic laminate) countertop and all bathroom fixtures o Install fiberglass insulation at all walls o Install new 5/8" Green Board all walls o Floor level entire room o Provide and Install new floor drain o Provide and Install new floor tile and threshold (see specs) o Provide and Install new wall tile - full height at wet walls and 48inches in rest of bathroom (see specs) o Provide and install new PL (plastic laminate) countertop and backsplash (see specs) o Paint all walls that are not tile - prime and two coats (see paint specs) o Patch and paint ceiling as required o Provide and Install new ADA compliant hands-free toilets and urinals fixtures o Provide and Install ADA compliant hands-free drop in lavatories o Provide and Install new bathroom partitions o Children's Restroom: o Remove existing tile on walls and floor o Remove all existing wall board to studs o Remove PL (plastic laminate) countertop and all bathroom fixtures o Install fiberglass insulation at all walls o Install new 5/8" Green Board all walls o Floor level entire room o Provide and Install new floor drain o Provide and Install new floor tile and threshold (see specs) o Provide and Install new wall tile - full height at wet walls and 48inches in rest of bathroom (see specs) o Provide and install new PL (plastic laminate) countertop and backsplash (see specs) o Paint all walls that are not tile - prime and two coats (see paint specs) o Patch and paint ceiling as required o Provide and Install new ADA compliant hands-free toilets and urinals fixtures o Provide and Install ADA compliant hands-free drop in lavatories o 2 Staff Bathrooms: o Remove all bathroom fixtures o Patch existing wall as needed. o Floor level entire room o Provide and Install new floor drain o Provide and Install new floor tile and threshold (see specs) o Provide and Install new wall tile - full height at wet walls and 48inches in rest of bathroom (see specs) o Paint all walls that are not tile - prime and two coats (see paint specs) o Patch and paint ceiling as required o Provide and Install new ADA compliant hands-free toilet o Provide and Install ADA compliant hands-free wall mounted lavatories

GC Bidding

Library

$200,000.00

Public - City

Renovation

7

9

2

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
731
Active Projects
420
Bidding Soon
3,808
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 27, 2026

March 30, 2026

Project location map

100 Boone St, North Kingstown, RI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.