Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 16, 2026 at 7:00 PM
Updated February 17, 2026
Renovation of a library in North Kingstown, Rhode Island. Completed plans call for the renovation of a library.
Reference Number 0000410197 The Municipal Offices Are Open 8:30am - 4:30pm, Monday Through Friday. Please Plan Accordingly. *please Submit an Original and One (1) Electronic Copy (Thumb Drive). Question Deadline 02/11/2026 at 4:00 PM ET Questions are submitted online No . All questions are to be submitted in writing via email to: Tim McDavitt, Purchasing/Finance tmcdavitt@northkingstownri.gov . Scope, Bidding & Performance of Work The Town of North Kingstown (Owner) is seeking bid proposals from qualified Contractors for work associated with the renovation of the restrooms to the North Kingstown Public Library building. located at 100 Boone Street, North Kingstown, RI. o Review of the existing conditions. o Men's Restroom: o Remove existing tile on walls and floor o Remove all existing wall board to studs o Remove bathroom partitions o Remove PL (plastic laminate) countertop and all bathroom fixtures o Install fiberglass insulation at all walls o Install new 5/8" Green Board all walls o Floor level entire room o Provide and Install new floor drain o Provide and Install new floor tile and threshold (see specs) o Provide and Install new wall tile - full height at wet walls and 48inches in rest of bathroom (see specs) o Provide and install new PL (plastic laminate) countertop and backsplash (see specs) o Paint all walls that are not tile - prime and two coats (see paint specs) o Patch and paint ceiling as required. o Provide and Install new ADA compliant hands-free toilets and urinals fixtures o Provide and Install ADA compliant hands-free lavatories o Provide and Install new bathroom partitions o Women's Restroom: o Remove existing tile on walls and floor o Remove all existing wall board to studs o Remove bathroom partitions o Remove PL (plastic laminate) countertop and all bathroom fixtures o Install fiberglass insulation at all walls o Install new 5/8" Green Board all walls o Floor level entire room o Provide and Install new floor drain o Provide and Install new floor tile and threshold (see specs) o Provide and Install new wall tile - full height at wet walls and 48inches in rest of bathroom (see specs) o Provide and install new PL (plastic laminate) countertop and backsplash (see specs) o Paint all walls that are not tile - prime and two coats (see paint specs) o Patch and paint ceiling as required o Provide and Install new ADA compliant hands-free toilets and urinals fixtures o Provide and Install ADA compliant hands-free drop in lavatories o Provide and Install new bathroom partitions o Children's Restroom: o Remove existing tile on walls and floor o Remove all existing wall board to studs o Remove PL (plastic laminate) countertop and all bathroom fixtures o Install fiberglass insulation at all walls o Install new 5/8" Green Board all walls o Floor level entire room o Provide and Install new floor drain o Provide and Install new floor tile and threshold (see specs) o Provide and Install new wall tile - full height at wet walls and 48inches in rest of bathroom (see specs) o Provide and install new PL (plastic laminate) countertop and backsplash (see specs) o Paint all walls that are not tile - prime and two coats (see paint specs) o Patch and paint ceiling as required o Provide and Install new ADA compliant hands-free toilets and urinals fixtures o Provide and Install ADA compliant hands-free drop in lavatories o 2 Staff Bathrooms: o Remove all bathroom fixtures o Patch existing wall as needed. o Floor level entire room o Provide and Install new floor drain o Provide and Install new floor tile and threshold (see specs) o Provide and Install new wall tile - full height at wet walls and 48inches in rest of bathroom (see specs) o Paint all walls that are not tile - prime and two coats (see paint specs) o Patch and paint ceiling as required o Provide and Install new ADA compliant hands-free toilet o Provide and Install ADA compliant hands-free wall mounted lavatories
GC Bidding
Library
$200,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 27, 2026
March 30, 2026
100 Boone St, North Kingstown, RI
Related To This Project
North Kingstown, RI
--
North Kingstown, RI
Bid Date: Jan 23 2026
North Kingstown, RI
Bid Date: Jan 27 2026
North Kingstown, RI
Bid Date: Jan 30 2026
North Kingstown, RI
Bid Date: Jan 23 2026
North Kingstown, RI
Bid Date: Dec 29 2025
North Kingstown, RI
Bid Date: Dec 19 2025
North Kingstown, RI
Bid Date: Nov 10 2025
North Kingstown, RI
Bid Date: Dec 09 2025
North Kingstown, RI
--
North Kingstown, RI
Bid Date: Nov 20 2025
North Kingstown, RI
Bid Date: Dec 03 2025
North Kingstown, RI
Bid Date: Nov 12 2025
North Kingstown, RI
Bid Date: Oct 23 2025
North Kingstown, RI
Bid Date: Oct 21 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
