BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 13, 2026 at 8:00 PM

Updated March 14, 2026

Site work and renovation of a playground / park / athletic field in Vantage, Washington. Completed plans call for the renovation of a playground / park / athletic field; and for site work for a playground / park / athletic field.

This Contract includes replacement of the heating and cooling systems and replacement of the roofing at the Ginkgo Interpretive Center. Work includes ductwork, HVAC equipment, refrigerant piping, controls, electrical, roofing, insulation, and related general work. See "Hazardous Building Materials Inspection Report" for hazardous materials; provide abatement as noted in the report. Question Deadline 02/27/2026 Online Portal. TECHNICAL QUESTIONS regarding this project shall be directed to Rick Hultz, P.E., at: Hultz BHU Engineers, 1111 Fawcett Avenue, Suite 100, Tacoma, WA 98402, Phone: (253) 383-3283 , e-mail: rickh@hultzbhu.com. QUESTIONS must be received at least seven (7) working days prior to the bid deadline to be considered.

Bid Results

Playgrounds / Parks / Athletic Fields

$260,000.00

Public - State/Provincial

Renovation, Site Work

16

9

2

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
2
Bidding Soon
156
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

April 9, 2026

Project location map

630 Ginkgo Ave, Vantage, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.