BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 11, 2026 at 8:00 PM

Updated March 12, 2026

Site work for a water / sewer project in Howe, Indiana. Completed plans call for site work for a water / sewer project; and water / sewer project.

**As of March 11, 2026, this project has not yet been awarded. A timeline for the award has not yet been established.** Contract A - Wastewater Treatment Plant Improvements includes the following work: expansion of the existing wastewater treatment plant with replacement of the existing Plant Lift Station pumps; installation of new Extended Aeration Equipment, including a new Blower & VFD; expanded tankage for the new Extended Aeration Equipment; yard piping; expansion of the sludge dewatering pad; electrical and instrumentation; and landscape and drive restoration. Mandatory Alternate Bid No. 1 is for a dry sludge storage structure, and Mandatory Alternate Bid No. 2 is for a UV disinfection/post-aeration structure cover. For requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders in the Bidding Documents. The Owner reserves the right to reject any unresponsive or irresponsible proposal, reject all proposals, or accept the lowest responsive and responsible proposal or bidder. Proposals may be withdrawn prior to the scheduled opening, but not afterward for at least one hundred fifty (150) days while final project approvals are acquired. Wage rates must not be less than the Federal Davis-Bacon wage scale published by the U.S. Department of Labor. All iron and steel products used must be produced in the United States under the American Iron and Steel requirement. Certain waivers apply for de minimis, minor components, and pig iron and direct reduced iron. QA date - 2-13-2026 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. As indicated in the Advertisement for Bids Questions received less than seven days prior to the date for opening of Bids may not be answered.

Bid Results

Water / Sewer

$4,297,792.00

Public - County

Site Work

50

28

11

4

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
37
Active Projects
0
Bidding Soon
642
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

April 21, 2026

Project location map

55 IN-9, Howe, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.