BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 16, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of an educational facility in Palmerton, Pennsylvania. Completed plans call for the renovation of a 2,300-square-foot educational facility.

The project consists of the removal and disposal of approximately 2,300 square feet of asbestos-containing floor tile and associated asbestos-containing floor tile mastic and a total of 185 sections of asbestos-containing fitting insulation throughout the High School. This project will be completed in 3 phases: Phase 1 includes the removal and disposal of 55 sections of asbestos-containing fitting insulation in the First Floor B Hallway of the High School. Question Deadline 02/11/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. This is a two (2) Year Contract for the removal and disposal of approximately 2,300 square feet of asbestos-containing floor tile and asbestos containing floor tile mastic (mostly located under carpet) in the High School Main Office and Adjacent rooms and approximately 185 sections of fitting insulation in designated areas in the High School: 1A: Phase 1 (April 2, 2026 through April 6, 2026) Removal and disposal of approximately 55 sections of fitting insulation from the First Floor B-Hallway. NOTE: Contractor will be responsible to remove the drop ceiling tiles to access the sections of fittings and replace the ceiling tiles when finished. Care should be taken to not damage the ceiling tiles. 1B: Phase 2 (June 8, 2026 to June 19, 2026) Removal and disposal of approximately 130 sections of fitting insulation from the First Floor B-Hallway (2 nd Half), Boiler Room, Boiler Room Hallway and Mechanical Room. NOTE: Contractor will be responsible to remove the drop ceiling tiles to access the sections of fittings and replace the ceiling tiles when finished. Care should be taken to not damage the ceiling tiles. 1C: Phase 3 (June 14, 2027** to June 20, 2027) Removal and disposal of approximately 2,300 feet of asbestos-containing floor tile and asbestos containing floor tile mastic, mostly located under carpet, in the High School Main Office and Adjacent Rooms. Contractor is responsible for disposal of carpet.

Award

Educational

$39,812.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
715
Active Projects
399
Bidding Soon
4,786
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 18, 2026

April 2, 2026

Project location map

3525 Fireline Rd, Palmerton, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.