BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 2, 2026 at 8:00 PM

Updated June 10, 2026

Site work for an educational facility in Joliet, Illinois. Completed plans call for site work for a educational facility; educational facility; and educational facility.

Projects consist of the following: Joliet Central High School Parking Lot Restoration of Lots P1, P2, P3. Project consists of the following work. Removal of existing pavement cross section, reshape existing sub-base, new curb & gutter, pavement and striping. Project includes new parking lot lighting. Substantial completion is scheduled for August 2026. Joliet West High School Parking Lot & Athletic Drive Restoration. Project consists of the following work. Grinding & removal of existing asphalt, Removal of existing pavement cross section, reshape existing sub-base, new pavement and striping, perforated underdrains and yard drains including sitework and seeding, and miscellaneous site work including fencing, bleacher pads, bollards. Substantial completion is scheduled for August 2026. Joliet West High School Mechanical Piping Reroute. Project consists of the following work. Reroute existing mechanical piping, in preparation of future work, including ceiling removal and reinstallation. Substantial completion is scheduled for August 2026. JTHS Administration Building North Entrance Pedestrian Bridge. Project consists of the following work. Removal of existing entrance pedestrian bridge spanning over pond, including precast planks and foundations. Include coffer dam new retaining wall and foundations, and new concrete walkway with guard rail. Substantial completion is scheduled for August 2026. The following Bid Packages have been previously bid and awarded. 03C Site Concrete, 05C Guard Rails, 06D Carpentry / Acoustical, 23C HVAC Piping, 26C Electrical, 31C Site Work BID RELEASE 3 REBID - BID PACKAGES Bid Pckg. 31B Description Paving IMPORTANT NOTE! The bidding of this Project will be through Procore Bidding. Parking details and site contact info to be sent to interested trades. Last day for questions is Tuesday, March 31, 2026, at 12:00 p.m. local time. Joliet Township High School District 204 and Gilbane Building Company reserve the right to reject any or all bids. Bid Security in the form of a bid bond in an amount equal to ten percent (10%) of the base bid is required from all Bidders. No other forms of Bid Security will be accepted. Guarantee Bonds in the form of a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid will be required from the awarded Bidder. The work will be done in accordance with the Contract Documents. All contractors and subcontractors rendering services under this contract must comply with all requirements of the Act, including but not limited to, all wage, notice and record keeping duties.

Post-Bid

Educational

$3,000,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
502
Active Projects
311
Bidding Soon
4,354
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2026

June 8, 2026

Project location map

To be determined, Joliet, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.