BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 13, 2026 at 7:00 PM

Updated February 17, 2026

Site work for a sidewalk / parking lot in Fort Wayne, Indiana. Completed plans call for site work for a sidewalk / parking lot.

The contractor shall furnish all labor, insurance, equipment, materials, and power for the complete performance of asphalt pavement patching at various locations throughout the city, in accordance with the bidding documents as prepared by City Utilities Engineering Department, City of Fort Wayne, Indiana. Bids will only be accepted through the online bidding partner QuestCDN. Project bid documents must be downloaded from QuestCDN, which will add bidders to the Planholder List and allow access to vBid online bidding, which is required for this project. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond and Performance Bond, each in the amount of not less than 100% of the contract price. The Board reserves the right to reject any and all bids for failure to comply with applicable laws and/or instructions to bidders and also reserves the right to waive any defect in any bid. No bid may be withdrawn for at least 60 days after the scheduled time for receipt of bids. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Design Manager in writing Questions received less than ten (10) days prior to the date for opening of Bids may not be answered. a. The following asphalt restoration locations as shown on the Asphalt Restoration Locations and Quantities exhibit shall be constructed by May 1 st, 2026. 1) 1004 W Washington Blvd (WO#937515) 2) 101 E Washington Blvd (WO#964379) 3) 1111 S Clinton St (WO#934592) 4) 1529 Spy Run Ave (WO#926504) 5) 1710 W Main St (WO#946999) 6) 2404 W Jefferson Blvd (WO#957105) 7) 2709 Lafayette St (WO#973197) 8) 708 E Jefferson Blvd (WO#938671) 9) 914 W Jefferson Blvd (WO#944744) 10) Broadway St and Bluffton Rd (WO#943269) 11) Broadway St and W Main St (WO#941588) 12) Lafayette St and E Lewis St (WO#913412) 13) Maumee Ave and Sidney St (WO#942700) 14) S Hannah St and E Washington Blvd (WO#961753) 15) W Jefferson Blvd and Van Buren St (WO#934594) 16) W Main St and Van Buren St (WO#912785) 17) W Washington Blvd and Van Buren St (WO#912786) 18) Ruth St and Spy Run Ave (WO#973296) 2. Milestone 2 a. The following asphalt restoration locations as shown on the Asphalt Restoration Locations and Quantities exhibit shall be constructed by May 19th, 2026. 1) 1502 E Paulding Rd (WO#956652) 2) 1723 Sherman Blvd (WO#966212) 3) 2113 Lower Huntington Rd (WO#935579) 4) 2507 Parnell Ave (WO#966276) 5) 2633 W State Blvd (WO#937093) 6) 3417 S Anthony Blvd (WO#968065) 7) 3600 Illinois Rd (WO#945414) 8) 3702 Fairfield Ave (WO#963796) 9) 4136 Maplecrest Rd (WO#966119) 10) 4203 W Jefferson Blvd (WO#942622) 11) 5218 Moeller Rd (WO#954024) 12) 5717 W Jefferson Blvd (WO#943593) 13) 5840 S Calhoun St (WO#964899) 14) 801 E Tillman Rd (WO#968240) 15) 814 Goshen Rd (WO#960940) 16) 8705 Winchester Rd (WO#960264) 17) 999 E Tillman Rd (WO#946387) 18) Coldwater Rd and Tillwater Ln (WO#920423) 19) Fairfield Ave and W Lenox Ave (WO#940955) 20) Hessen Cassel Rd and Paulding Rd (WO#956420) 21) Stellhorn Rd and Oakhurst Dr (WO#966204) 22) W State Blvd and St Marys Ave (WO#972329) 3. Milestone 3 a. The following asphalt restoration locations as shown on the Asphalt Restoration Locations and Quantities exhibit shall be constructed by June 12th, 2026. 1) 1206 Leesburg Rd (WO#939845) 2) 14417 Covington Rd (WO#946956) 3) 1523 W Ludwig Rd (WO#965358) 4) 1709 Lindenwood Ave (WO#963794) 5) 1836 S Calhoun St (WO#960311) 6) 1903 W Wallen Rd (WO#943230) 7) 1903 W Wallen Rd (WO#942124) 8) 1919 Tyler Ave (WO#943065) 9) 215 W Masterson Ave (WO#937642) 10) 2317 S Harrison St (WO#966201) 11) 3002 Brooklyn Ave (WO#966274) 12) 4411 Industrial Rd (WO#954722) 13) 4949 Rothman Rd (WO#964291) 14) 5811 Covington Rd (WO#926235) 15) 6501 Wayne Trace (WO#962020) 16) 6529 Huguenard Rd (WO#917126) 17) 6529 Huguenard Rd (WO#942299) 18) 7638 Maysville Rd (WO#965629) 19) Ashton Pointe Blvd and Dunkelberg Rd (WO#937371) 20) Covington Rd and Covington Lake Dr (WO#949885) 21) E Pettit Ave and Avondale Dr (WO#967739) 22) E Pettit Ave and Avondale Dr (WO#964858) 23) E Pettit Ave and Weisser Park Ave (WO#962869) 24) Hadley Rd and Covington Rd (WO#941302) 25) Lumbard St and Reynolds St (WO#964860) 26) Progress Rd and Executive Blvd (WO#947645) 27) Progress Rd and Value Dr (WO#948111) 28) S Monroe St and E Pettit Ave (WO#964317) 29) W Ludwig Rd and Lima Rd (WO#961265) 30) W Ludwig Rd and Lima Rd (WO#964807) 31) W Pettit Ave and Hoagland Ave (WO#957721) 32) Winchester Rd and Shamrock Rd (WO#966656) EBE goal for THIS PROJECT is 10% of the Contract Price SRF Federally Funded Projects: The Federal government has established a combined participation goal of 12% for Women Business Enterprises and Minority Business Enterprises. A. The purpose of this project is to restore asphalt pavement in the city where City Utilities has excavated the pavement to perform maintenance or repair on City Utilities infrastructure. The locations of these asphalt restorations are distributed throughout the city, and the Asphalt Restoration Locations and Quantities exhibit included in this Contract lists the locations and construction quantities estimated to be required at each location. Concrete infrastructure such as sidewalk and curbs will not be restored with this Contract. Other miscellaneous restoration such as lawn restoration will be required at some of the locations. B. The Contractor is responsible for obtaining the exact field location of each restoration Site from the Engineer. Addresses shown in the Asphalt Restoration Locations and Quantities exhibit are for reference only and are not intended to identify the precise limits of restoration. Work completed at an incorrect location shall not be eligible for payment, and the Contractor shall perform the restoration at the correct location at no additional cost to the Owner. C. The Contractor shall provide all tools, equipment, vehicles, and incidental facilities necessary to perform the Work. No temporary utilities, sanitary facilities, or field offices will be provided by the Owner or required on Site

Post-Bid

Sidewalks / Parking Lot

$2,000,000.00

Public - City

Site Work

53

13

12

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
118
Bidding Soon
1,157
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 12, 2026

April 13, 2026

Project location map

Multiple Locations, Fort Wayne, IN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.