Renovation of an educational facility in Fort Lee, New Jersey. Completed plans call for the renovation of a educational facility.

The work involves renovations to the Girls and Boys Locker Rooms at Fort Lee High School. Terms of proposal and surety required are defined by the specifications. Drawings and specifications can be inspected and obtained from Environetics Group Architects, P.C. for a non-refundable deposit. A pre-bid conference will be held for bidders to ask questions. Requests for clarification and interpretation must be submitted in writing. Bids must be accompanied by a certified check or bid bond for 10% of the maximum bid amount, not exceeding $20,000. A 100% performance bond is required from the successful bidder. Bidders must be pre-qualified by the New Jersey State Board of Education and comply with the Public Disclosure Law and other applicable requirements. Bids must be delivered by hand or time/date receipted courier to the Board of Education office. The Board of Education reserves the right to reject any or all bids or waive defects or informalities in bids as it deems in the best interest of the School District. All businesses must provide proof of registration with the NJ Department of Treasury to conduct business with any school district. The Work consists of all labor, materials and equipment necessary for the gut and renovation of (4) existing first floor locker rooms, bathrooms and team locker rooms and renovating into new girls and boys locker room, bathrooms and team rooms. Work includes, but is not necessarily limited to, demolition and disposal of existing concrete slab, tile mud job, walls, doors, plumbing fixtures, plumbing, toilet partitions, lockers, finishes, flooring, ceiling, lighting, electrical, etc. and installation of new concrete floor slabs, walls, partitions, wall finishes, floor finishes, ceilings, lighting, plumbing, plumbing fixtures, toilet accessories, display walls, showers, electrical, doors, door frames, hardware, some HVAC ductwork and registers modifications, etc. new metal lockers and benches will be provided and installed by others. Contractor is responsible for coordinating the installation and coordinating all new concrete locker curbs with new lockers. Provide electrical disconnects for light fixtures in the shower areas and plumbing shut off as required for the abatement team. All requests for clarification and/or interpretation by Bidders must be submitted in writing to ENV Question Deadline 02/23/2026 at 4:00 PM ET

Award

Educational

$1,033,000.00

Public - City

Renovation

35

16

13

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
267
Active Projects
6
Bidding Soon
4,039
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

June 29, 2026

Project location map

3000 Lemoine Ave, Fort Lee, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.