Published February 19, 2026 at 7:00 PM
Updated February 20, 2026
Site work for a water / sewer project in Marion, Alabama. Completed plans call for site work for a water / sewer project.
**As of February 17th, this project has been awarded to Causey Underground Construction for $164,000.** The work involves providing equipment for the Proposed Marion DWSRF Critical Needs Infrastructure Improvements Project Phase 1, Contract No. 8 - Marion Water Treatment Plant Backwash Pump and High Service Pump Replacement, DWSRF Project No. FS010248-03. The principal items of work include removing the existing vertical backwash turbine pump and installing a new vertical turbine backwash pump, as well as making electrical connections. The contract will be awarded to the lowest responsible and responsive bidder. The contract time is 60 consecutive calendar days, and liquidated damages will be assessed if this time is exceeded. All applicable Federal guidelines must be met, and the Owner reserves the right to reject any or all bids and to waive any informality in any bid. There will be no pre-bid conference. The principal items of work are detailed herein below. Principal Work: 1. Remove Existing Vertical Backwash Turbine Pump and Install a new Vertical Turbine Backwash Pump 2. Electrical Connections There will be no Pre-Bid Conference. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The project objectives for utilization of Minority Business Enterprises (MBEs) and Women's Business Enterprises (WBEs) are as follows: Commodities (Supplies) MBE 4% WBE 11% Contractual (Services) MBE 8% WBE 30% Equipment MBE 5% WBE 20% Construction MBE 2.5% WBE 3%
Award
Water / Sewer
$164,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 17, 2026
March 19, 2026
123 Jefferson St, Marion, AL
Related To This Project
Marion, AL
Bid Date: Mar 10 2026
Marion, AL
Bid Date: Apr 09 2026
Marion, AL
Bid Date: Apr 17 2026
Marion, AL
Bid Date: Apr 17 2026
Marion, AL
Bid Date: Mar 10 2026
Marion DWSRF Critical Needs Infrastructure Improvements Project - Phase I - Contract No. 9 - 6028385
Marion, AL
Bid Date: Feb 17 2026
Marion, AL
Bid Date: Feb 17 2026
Marion DWSRF Critical Needs Infrastructure Improvements Project - Phase I - Contract No. 8 - 6028468
Marion, AL
Bid Date: Feb 17 2026
Marion DWSRF Critical Needs Infrastructure Improvements Project - Phase I - Contract No. 7 - 6029461
Marion, AL
Bid Date: Feb 17 2026
Marion, AL
Bid Date: Nov 24 2025
Marion, AL
Bid Date: Nov 07 2025
Marion, AL
Bid Date: Oct 28 2025
Marion, AL
Bid Date: Jul 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.