BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 16, 2026 at 8:00 PM

Updated March 17, 2026

Site work for a water / sewer project in Marion, Alabama. Completed plans call for site work for a water / sewer project.

The work consists of furnishing all labor, materials, and equipment, and performing the work required to construct the specified improvements according to the Plans, Specifications, and Contract Documents. The main project is the City of Marion Source Water Rehabilitation Project Contract "B" AMR Water Meter Replacement Project - Installation Only. Principal work for Contract "A" includes procuring approximately 1,215 AMR meters, 750 meter boxes, 607 backflow valves, 415 curb stops, a data collection unit with start-up and support, applicable software, and ancillary system support. Principal work for Contract "B" includes installing approximately 1,215 AMR meters, 750 meter boxes, 607 backflow valves, and 415 curb stops. All material must comply with Build America/Buy America (BABA) requirements, and a letter from manufacturers will be required for project materials. The Supplier for Contract "A" will have 60 consecutive calendar days to complete work, while the Contractor for Contract "B" will have 275 consecutive calendar days; liquidated damages will be assessed if the contract time is exceeded. Bidders are required to follow all applicable Federal guidelines as the project is funded through an EPA Community Grant and SRF ARPA Funds. The Owner reserves the right to reject any or all bids, waive informalities, and accept any bid considered advantageous. Question Deadline 02/27/2026: All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered. Proposed Total DBE/MBE Participation: Goal: 2.5%

Bid Results

Water / Sewer

$148,050.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

15

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
12
Active Projects
0
Bidding Soon
454
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 10, 2026

April 9, 2026

Project location map

123 Jefferson St, Marion, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.