Published February 19, 2026 at 7:00 PM

Updated February 20, 2026

Site work for a water / sewer project in Marion, Alabama. Completed plans call for site work for a water / sewer project.

**As of February 17th, this project has been awarded to Causey Underground Construction for $164,000.** The work involves providing equipment for the Proposed Marion DWSRF Critical Needs Infrastructure Improvements Project Phase 1, Contract No. 8 - Marion Water Treatment Plant Backwash Pump and High Service Pump Replacement, DWSRF Project No. FS010248-03. The principal items of work include removing the existing vertical backwash turbine pump and installing a new vertical turbine backwash pump, as well as making electrical connections. The contract will be awarded to the lowest responsible and responsive bidder. The contract time is 60 consecutive calendar days, and liquidated damages will be assessed if this time is exceeded. All applicable Federal guidelines must be met, and the Owner reserves the right to reject any or all bids and to waive any informality in any bid. There will be no pre-bid conference. The principal items of work are detailed herein below. Principal Work: 1. Remove Existing Vertical Backwash Turbine Pump and Install a new Vertical Turbine Backwash Pump 2. Electrical Connections There will be no Pre-Bid Conference. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. The project objectives for utilization of Minority Business Enterprises (MBEs) and Women's Business Enterprises (WBEs) are as follows: Commodities (Supplies) MBE 4% WBE 11% Contractual (Services) MBE 8% WBE 30% Equipment MBE 5% WBE 20% Construction MBE 2.5% WBE 3%

Award

Water / Sewer

$164,000.00

Public - City

Site Work

4

18

4

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
55
Bidding Soon
758
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

123 Jefferson St, Marion, AL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.