Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2026 at 8:00 PM
Updated March 21, 2026
Site work and paving for a mixed-use development in Springfield, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
**As of March 20, 2026, the project was awarded to C & A Construction Construction but the awarded amount is not available.** Work includes the construction of concrete sidewalks, and pedestrian curb ramps, installation of pavement markings, installation of rectangular rapid flashing beacons (RRFB's) and solar powered radar speed signs, and the installation of miscellaneous traffic signage. DPW's 2026 Roadway Safety Improvements, Complete Streets and Shared Streets. In order for a bid to be deemed valid, the Contractor must be prequalified by MassDOT in the specific class of work of Highway Sidewalk and Curing OR Highway Construction with a single contract limit at or above the dollar value of the project. AT BELMONT AVE AND WOODLAWN ST - BASE BID NO. 1 (COMPLETE STREETS FUNDING) AT BERKSHIRE AVE , HOLLY ST AND DENSELEY RD -BASE BID NO. 2 AT BIRNIE AVENUE AT ROOSEVELT AVENUE - BASE BID NO. 4 (COMPLETE STREETS FUNDING) Interested Proposers may submit written questions through close of business on February 12, 2026. All questions must be submitted electronically to lstabilo@springfieldcityhall.com. Only emailed questions will be accepted The work shall consist of: Base Bid No. 1 on Belmont and Woodland Street: Installation of two (2) new curb extensions, pedestrian beacons, pavement markings, cement concrete walks, pedestrian curb ramps, utilizing Complete Streets funding. o Base Bid No. 2 on Berkshire Ave, Denesley Road and Holly Street: Instal1 ation of three (3) new curb extensions, cement concrete sidewalks, cement concrete pedestrian curb ramps and associated work along, utilizing Shared Streets funding. o Base Bid No. 3 on Birnie Avenue: Installation of pavement markings, traffic beacons and various other traffic calming methods, utilizing City Funding. (This Work cannot commence until August 1, 2026.) o Base Bid No. 4 on Roosevelt Avenue: Installation of 2,330-feet of cement concrete walks, driveway entrances, pedestrian curb ramps, utilizing Complete Streets funding.
Award
Sidewalks / Parking Lot
$830,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 20, 2026
March 20, 2026
Multiple Locations, Springfield, MA
Related To This Project
Springfield, MA
Bid Date: Feb 25 2026
Springfield, MA
Bid Date: Feb 10 2026
Springfield, MA
Bid Date: Mar 05 2026
Springfield, MA
Bid Date: Mar 03 2026
Springfield, MA
Bid Date: Mar 03 2026
Springfield, MA
Bid Date: Feb 11 2026
Springfield, MA
Bid Date: Mar 03 2026
Springfield, MA
Bid Date: Feb 18 2026
Springfield, MA
--
Springfield, MA
Bid Date: Feb 04 2026
Springfield, MA
Bid Date: Feb 05 2026
Springfield, MA
Bid Date: Mar 12 2026
Springfield, MA
Bid Date: Feb 12 2026
Springfield, MA
Bid Date: Feb 03 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
