BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 20, 2026 at 8:00 PM

Updated March 21, 2026

Site work and paving for a mixed-use development in Springfield, Massachusetts. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of March 20, 2026, the project was awarded to C & A Construction Construction but the awarded amount is not available.** Work includes the construction of concrete sidewalks, and pedestrian curb ramps, installation of pavement markings, installation of rectangular rapid flashing beacons (RRFB's) and solar powered radar speed signs, and the installation of miscellaneous traffic signage. DPW's 2026 Roadway Safety Improvements, Complete Streets and Shared Streets. In order for a bid to be deemed valid, the Contractor must be prequalified by MassDOT in the specific class of work of Highway Sidewalk and Curing OR Highway Construction with a single contract limit at or above the dollar value of the project. AT BELMONT AVE AND WOODLAWN ST - BASE BID NO. 1 (COMPLETE STREETS FUNDING) AT BERKSHIRE AVE , HOLLY ST AND DENSELEY RD -BASE BID NO. 2 AT BIRNIE AVENUE AT ROOSEVELT AVENUE - BASE BID NO. 4 (COMPLETE STREETS FUNDING) Interested Proposers may submit written questions through close of business on February 12, 2026. All questions must be submitted electronically to lstabilo@springfieldcityhall.com. Only emailed questions will be accepted The work shall consist of: Base Bid No. 1 on Belmont and Woodland Street: Installation of two (2) new curb extensions, pedestrian beacons, pavement markings, cement concrete walks, pedestrian curb ramps, utilizing Complete Streets funding. o Base Bid No. 2 on Berkshire Ave, Denesley Road and Holly Street: Instal1 ation of three (3) new curb extensions, cement concrete sidewalks, cement concrete pedestrian curb ramps and associated work along, utilizing Shared Streets funding. o Base Bid No. 3 on Birnie Avenue: Installation of pavement markings, traffic beacons and various other traffic calming methods, utilizing City Funding. (This Work cannot commence until August 1, 2026.) o Base Bid No. 4 on Roosevelt Avenue: Installation of 2,330-feet of cement concrete walks, driveway entrances, pedestrian curb ramps, utilizing Complete Streets funding.

Award

Sidewalks / Parking Lot

$830,000.00

Public - City

Paving, Site Work

26

6

2

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
202
Active Projects
2
Bidding Soon
2,688
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 20, 2026

March 20, 2026

Project location map

Multiple Locations, Springfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.