Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 25, 2026 at 8:00 PM
Updated April 1, 2026
Site work for a water / sewer project in Miramar, Florida. Completed plans call for site work for a water / sewer project.
Furnish all labor, equipment and materials necessary to perform the following water treatment plant construction and improvement elements described in the plans (uploaded separately). The scope includes: o The construction on new sand separation system including, but not limited to, sand strainer, sedimentation tank, process piping, valves, electrical, instrumentation, controls, supports, and all other appurtenances necessary to make a complete working system. Except as otherwise noted, the Contractor will provide and pay for: a. Mobilization and demobilization b. Labor, materials and equipment c. Tools, construction equipment and fuel d. Electricity, water and utilities required for construction e. Freight and sales tax f. Testing and laboratory services g. Surveying and field engineering h. Record Information in electronic form (both AutoCAD and PDF) and a hardcopy. Information will be used by the Engineer for record drawing development. i. Compliance with all the conditions of the permits issued for this project j. Construction dewatering (if required) The commencement date shall be established in the Notice to Proceed. Contractor shall commence the Work within 10 Days from the commencement date. The Work shall be Substantially Complete within 365 Calendar Days after the commencement date given in the Notice to Proceed. The Work shall be Finally Completed for full acceptance by the City within 400 Calendar Days after the commencement date given in the Notice to Proceed. Bids shall be accompanied by a certified or cashier's check, or Bid Bond, in the amount of five percent of the Total Bid Price, payable to the City of Miramar, Florida, as a guarantee that the Bidder, upon acceptance, will promptly execute the Agreement and complete the Work in accordance with the Contract Documents and the Total Bid Price stated in its Bid submittal. Bids shall not be considered unless one of the previously stated forms of Bidder's security is enclosed with the Bid. The City reserves the right to reject any or all Bids, to waive any informalities or irregularities in the Solicitation process, to award certain areas or all of the Work to the lowest responsive, responsible Bidder, as deemed in the best interest of the City. Deadline for Questions March 9, 2026 Pre bid meeting description: At the start of the meeting, please send an email indicating you are on the call to: dicharles@miramarfl.gov. Once you are on the call, please be respectful of others and mute your phone so that everyone can hear without background interferences.
Post-Bid
Water / Sewer
$1,375,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 31, 2026
April 20, 2026
2600 SW 66th Terrace, Miramar, FL
Related To This Project
Miramar, FL
Bid Date: Feb 24 2026
Miramar, FL
Bid Date: Feb 26 2026
Miramar, FL
--
Miramar, FL
Bid Date: Mar 19 2026
Miramar, FL
Bid Date: Apr 02 2026
Miramar, FL
Bid Date: Jan 29 2026
Miramar, FL
Bid Date: Jan 27 2026
Miramar, FL
Bid Date: Jan 29 2026
Miramar, FL
Bid Date: Jan 13 2026
Miramar, FL
Bid Date: Jan 21 2026
Miramar, FL
Bid Date: Jan 13 2026
Miramar, FL
Bid Date: Jan 06 2026
Miramar, FL
Bid Date: Jan 05 2026
Miramar, FL
Bid Date: Jan 13 2026
Miramar, FL
Bid Date: Jan 13 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
