BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published February 13, 2026 at 7:00 PM

Updated March 6, 2026

Renovation of a library in Springfield, Illinois. Completed plans call for the renovation of a library.

Illinois Secretary of State is requesting bids for the correction of water infiltration at the windows on the historic 3rd floor library portion of the Howlett Building, located at SUPPLIES AND/OR SERVICES REQUIRED: 1.2.2 The Contractor is responsible for all materials, equipment, supplies, labor, disposal services, incidentals, tools, and transportation to correct water infiltration 3rd floor North side Howlett Building as described herein and in attached drawings and specifications. 1.2.3 The Contractor is responsible for the Instillation of storm windows. 1.2.4 The Contractor will be responsible for repairing any damaged or deteriorated plaster, cracks, holes, bulges or gouges in wall surfaces as required to meet scope of work. 1.2.5 The Contractor is responsible to be within compliance of all applicable Building Codes. Work shall be executed in accordance with the fixed, unit price, project schedule, and applicable codes. 1.2.6 Contractor is responsible for procuring and scheduling all location services if required. 1.2.7 Contractor's work is to be performed during normal business hours: 7:00AM to 5:00PM, Monday through Friday. Any work done outside of these hours shall not be permitted except as arranged in advance with the Secretary of State's Office. 1.2.8 Contractor is responsible to properly remove and dispose of all debris related to their work including, but not limited to, electrical, mechanical, sanitary, soils, rock excavation, packing materials, scrap, uninstalled materials, and debris at the end of each shift of work. Upon completion of the project, the Contractor is required to clean any impacted area to a condition equal or better than the original condition. 1.2.9 Secretary of State's Office will provide a secure location for storage of materials and equipment. Contractor is 100% responsible for securing their working materials and equipment. 1.2.10 During the course of this project, Contractor is required to implement safety measures to protect building occupants and visitors. Contractor to provide safety barricades, signs, signals, etc. as necessary. 1.2.11 Contractor shall be solely responsible for risk assessments, managing health, and safety issues associated with this project.

Post-Bid

Library

$200,000.00

Public - State/Provincial

Renovation

3

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
87
Bidding Soon
901
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 5, 2026

April 6, 2026

Project location map

501 S 2nd Street, Springfield, IL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.