Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 17, 2026 at 8:00 PM

Updated March 18, 2026

Renovation of an educational facility in Millville, Utah. Completed plans call for the renovation of a educational facility.

Cache County School District is seeking to enter into an agreement with a qualified vendor to upgrade the electrical service at Millville Elementary School. The project requests a quote for a 1600A Service Entrance Switchboard/Switchgear. Cache County School District (CCSD) is upgrading the electrical service at Millville Elementary School. Due to strict summer construction windows (Summer 2026), the District is procuring the major electrical gear directly to mitigate lead-time risks. We are requesting a quote for a 1600A Service Entrance Switchboard/Switchgear. Both cost and lead time will be weighted factors in the selection process. Equipment Specifications: Please provide pricing and lead times for a Service Entrance Switchboard meeting the following requirements. Acceptable manufacturers are ABB, Eaton, Schneider Electric, or Siemens. Voltage/System: 120/208V, 3-phase, 4-wire Amperage: 1600A Bus AIC Values: 65,000 Enclosure: NEMA 3R (Outdoor) with lockable doors Service Entrance: UL Listed Service Entrance (SUSE) Utility Metering Must meet Rocky Mountain Power (RMP) standards Includes RM compliant CT/Pull section and EUSERC metering cabinet Orientation Left-to-Right Flow: The Utility/CT/Pull section must be on the LEFT side when viewing the gear from the front Main Disconnect 1600A Main Circuit Breaker (MCB)-1600 MCB must be able to accommodate 5 sets of 500kcmill CU conductors Protection: Must include ground fault equipment (GFE/LSIG) protection Safety: Must include a Reduced Energy Let-Through (RELT) maintenance switch Distribution/Future Capacity Provide provisional space/bus stabs for a future breaker up to 600A. Breaker not included in the purchase, but space/bussing must be ready Question Deadline 02/12/2026 at 1:00 PM MT The Question-and-Answer period closes on the date and time specified on U3P (Bonfire). All questions must be submitted through U3P during the Question-and-Answer period. Answers from the CCSD will be posted on U3P

Award

Educational

$37,275.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
57
Bidding Soon
868
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 17, 2026

March 19, 2026

Project location map

67 S Main St, Millville, UT


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed