BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 16, 2026

Site work and new construction of a pre-engineered storage facility in Millville, Utah. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

USDA-APHIS-Wildlife Services requires construction of a new kennel building in accordance with the final design documents from the A&E firm Cushing Terrell. The building will be a pre-engineered metal structure of approximately 3,400 square feet, divided into four sections: kennel areas A and B, a mud room, and a mechanical room. The facility supports the mission to generate and disseminate ecological information related to carnivore management, focusing on reducing conflicts with livestock, humans, and native prey species. The Predator Research Facility's mission is to generate and disseminate ecological information related to carnivore management, particularly aimed at reducing conflicts with livestock, humans, and native prey species. The Work consists of the following: 1. The Work constitutes construction of a new kennel facility with a central mud room and mechanical room. 2. The building type is a Pre-Engineered Metal Building with Concrete Masonry enclosure walls and chain link fencing to structure. . Project will be constructed under a single prime contract. 1. The project may be divided into two phases for funding purposes. If phased the scope will be as follows: a. Phase 1 - Work below ground and at grade level, consisting of: o Sitework o Underground Utilities o Concrete Foundations and Floor Slabs b. Phase 2 - Work above ground, consisting of: o Masonry Walls o Steel Structure o Roofing o Mechanical/ Plumbing Submit questions to james.g.roloff@usda.gov no later than April 24, 2026, at 12 p.m. CT. The estimated magnitude of this project is between $1M and $5M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$5,000,000.00

Public - Federal

New Construction, Site Work

56

24

4

3

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
76
Bidding Soon
678
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 8, 2026

June 9, 2026

Project location map

4200 S 600 E, Millville, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.