Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 12, 2026 at 7:00 PM
Updated February 13, 2026
Site work for a water / sewer project in Westfield, Massachusetts. Completed plans call for site work for a water / sewer project.
Cobble Mountain Unit 3 Valve Replacements at the Cobble Mountain Powerhouse (Project #26-25) involves replacing valves at the specified location. Bids from subcontractors will be accepted for plumbing and electrical work. General contractors must attend a mandatory pre-bid conference/site visit. Subcontractor bids require a bid deposit and must be submitted by the specified deadline. Prime/general contractor bids will also be accepted, with both bid types being publicly opened and read. Documents must be reviewed carefully and electronic document downloads require registration as a Plan Holder to receive notifications of project addenda. The Cobble Mountain Hydroelectric Station Unit 3 uses two large butterfly isolation valves, an electric motoroperated Upper Isolation Valve and a hydraulically controlled Lower Isolation Valve-for penstock and turbine shutoff. Both valves, original to the 1930s, are corroded, leak excessively, and have surpassed their design life, prompting a modernization project to replace them and the associated components with modern equipment rated for a 50-year lifespan. The new valves will be custom fabricated to fit the same footprint as the existing valves, eliminating the need for penstock modifications. The Project is estimated not to exceed $2,500,000. The procurement specifications include an alternative bid option to obtain cost and schedule information for also replacing Unit 1 valves, identical to the Unit 3 scope. Question Deadline 04/17/2026 at 4:30 PM ET All questions of Prime/General Contractor must be made in writing and received by the SWSC Chief Procurement Officer, Edward J. Sweeney via the following contact: edward.sweeney@waterandsewer.org.
GC Bidding
Water / Sewer
$2,500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 8, 2026
August 5, 2026
1711 Granville Rd, Westfield, MA
Related To This Project
Westfield, MA
Bid Date: Apr 24 2026
Westfield, MA
Bid Date: Feb 19 2026
Westfield, MA
--
Westfield, MA
Bid Date: Feb 19 2026
Westfield, MA
Bid Date: Feb 10 2026
Westfield, MA
--
Westfield, MA
Bid Date: Feb 06 2026
Westfield, MA
Bid Date: Feb 05 2026
Westfield, MA
Bid Date: Jan 21 2026
Westfield, MA
Bid Date: Jan 28 2026
Westfield, MA
Bid Date: Jan 07 2026
Westfield, MA
Bid Date: Dec 29 2025
Westfield, MA
Bid Date: Dec 02 2025
Westfield, MA
Bid Date: Dec 17 2025
Westfield, MA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
