BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 15, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Camilla, Georgia. Completed plans call for site work for a water / sewer project.

**As of April 15th, 2026, this project has been awarded to US Infra Rehab Services for $119,717.** The project consists of the cured-in-place relining of 15-inch and 18-inch diameter corrugated metal storm drainage pipe and the replacement of a drop inlet, with a total length of pipe relining of 650 feet. The work includes furnishing all materials, labor, tools, equipment, and any other miscellaneous items necessary for the repair of the existing storm drainage pipe network. Time of completion for all work associated with this project is 60 consecutive calendar days from the date of a written Notice to Proceed from the owner. Each bid must contain a bid bond or certified cashier's check in the amount of 5% of the total bid, be submitted in a sealed envelope, and be plainly marked with the relevant project information and the bidder's State of Georgia Utility Contractor License Number. Successful bidders are required to furnish insurance, workman's compensation insurance, and performance and payment bonds in the amount of 100% of the total bid. Bids must be made on the forms provided, with no alterations, and all qualification criteria must be enclosed. Successful bidders must have prior similar construction experience and must list these references in the required Bidder Experience Statement. Each bid must be submitted in a SEALED ENVELOPE, addressed to the OWNER. Each sealed envelope containing a Bid must be plainly marked on the outside as, "Bid for City of Camilla, Baseball Field Storm Drainage Rehabilitation and be labeled with the BIDDER'S State of Georgia Utility Contractor License Number. completion- 60 consecutive calendar days Question Deadline 03/17/2026 All requests for such interpretation shall be in writing addressed to York & Associates Engineering, Inc., 308 E. Water Street, Bainbridge, Georgia 39817, and to be given consideration, must be received at least two (2) days prior to the date fixed for the opening of bids.

Award

Water / Sewer

$119,717.00

Public - City

Site Work

4

9

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
38
Bidding Soon
668
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2026

April 20, 2026

Project location map

Multiple Locations, Camilla, GA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.