BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 30, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a water / sewer project in Kirkland, Quebec. Completed plans call for site work for a water / sewer project.

The work to be carried out consists of structural lining of water mains, replacement of stop valves, fire hydrants, residential stop boxes, backfilling and paving of excavation pits, as well as all related work described in the specifications. Water main work: Structural lining of water mains: 1,600 linear metres. Replacement of stop valves: 11 units. Replacement of fire hydrants: 9 units. Deadline for receipt of complaints 2026-02-26 Work must commence no later than 1 June 2026 and must continue without interruption until completion. The contractor must complete all work under this contract within a maximum of seventy (70) calendar days from the start date of the work. Required guarantees: . A bid bond equal to ten per cent (10%) of the total amount (including taxes) of the bid is required for this call for tenders; . A performance bond and a bond for the payment of labour, materials and services, each in the amount of fifty per cent (50%) of the total amount (including taxes) of the bid in favour of the City of Kirkland, valid for the entire initial term of the contract.

Award

Water / Sewer

$927,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
707
Active Projects
426
Bidding Soon
4,098
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 23, 2026

June 1, 2026

Project location map

Rue de Calais, Kirkland, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.