Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published February 17, 2026 at 7:00 PM
Updated February 18, 2026
Renovation of a municipal facility in Gary, Indiana. Completed plans call for the renovation of a municipal facility.
The Gary Sanitary District is requesting quotes for the replacement of RTU units on the Administration building. The existing system is a 12-zone system, approximately 30 years old, and manufactured by Carrier. A 12-18 week turnaround time is desired for installation. Question Submission Deadline:February 24, 2026, 10:00am all the necessary equipment, labor, and materials for the replacement of the Carrier Multizone RTU and zone control system. Installation to include: o Disconnect and remove the existing Carrier 30-ton multizone RTU. o Provide and install a new Carrier model 48K3HF30-1-6AODOA0 with multi- stage heating with stainless steel heat exchanger, 460-volt 3 phase, with SystemVu Controls with BACnet Capabilities. Hinged door, Ultra low leak economizer with Low static power exhaust-multi stage control, with Factory start-up. Refrigerant is R454B o Provide and install a custom roof top curb adaptor with all necessary zone dampers built-in. o Provide and install a new Pelican web based 10-zone control system. o Provide and install a Pelican wireless zone controller o Provide and install 10 Pelican Wireless Touchscreen thermostats o Provide and install 10 BELIMO 24-volt floating actuators on the zone dampers. o Provide and install 10 alarm sensors. o Provide and install a BELIMO outdoor air sensor. o Provide and install a Pelican extended range wireless gateway, and repeater. o Provide and install 10 supply duct temperature sensors. o Provide and install 3 transformers, 24v, 100 VA. o Provide and install a condensate trap and piping. o Provide and install a new RTU mounted Service Disconnect switch with fuses. o Include all necessary low voltage wiring. o Provide a 70-ton crane to hoist the equipment to the roof. o All necessary reclaiming of R-22 freon out of existing RTU. o Hauled away existing equipment and recycled. o All necessary labor for a complete and professional job. o Complete start up and test.
Sub-Bidding
Municipal
$100,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 6, 2026
April 6, 2026
3600 W 3rd Ave, Gary, IN
Related To This Project
Gary, IN
Bid Date: Feb 25 2026
Gary, IN
Bid Date: Feb 25 2026
Gary, IN
Bid Date: Feb 25 2026
Gary, IN
Bid Date: Feb 11 2026
Gary, IN
Bid Date: Feb 19 2026
Gary, IN
Bid Date: Feb 15 2026
Gary, IN
Bid Date: Feb 03 2026
Gary, IN
Bid Date: Jan 30 2026
Gary, IN
Bid Date: Feb 11 2026
Gary, IN
Bid Date: Jan 30 2026
Gary, IN
Bid Date: Feb 11 2026
Gary, IN
Bid Date: Jan 22 2026
Gary, IN
Bid Date: Jan 14 2026
Gary, IN
Bid Date: Feb 04 2026
Gary, IN
Bid Date: Jan 14 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
