BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2026 at 8:00 PM

Updated June 11, 2026

Renovation of a transportation facility in Lakeland, Florida. Working plans call for the renovation of a transportation facility.

Project has been Cancelled **As of March 25, 2026, project has not yet been awarded. A timeline for the award has not yet been established.** The City of Lakeland - Lakeland Linder International Airport (LAL) is requesting proposals for services of a qualified and experienced, state certified Roofing Contractor, registered and licensed in the State of Florida, to provide all labor, material, permitting, equipment, supervision and administration to integrate the work outlined in the provided scope of work for the roof replacement project at 3600 Drane Field Road, Lakeland, FL 33811. All Questions regarding this request for proposals shall be in writing and submitted electronically via the Portal through the Question and Answer tab before 5:00 pm on Wednesday, March 4, 2026. Responses will be released on the Question and Answer Tab. Project Summary: Remove and replace the existing metal roof on the designated hangar with a new Galvalume Metal Panel Roof System, including required ventilation components and replacement of the gutter system while retaining existing downspouts. Work must follow industry standards, manufacturer specifications, and all applicable airport safety regulations. Work Requirements A. Mobilization & Safety o Coordinate access and staging with airport staff. o Follow OSHA and airport safety protocols, including fall protection and escort/badging (if required). o Protect aircraft, vehicles, tenant property, and adjacent structures from debris or damage. B. Permits & Inspections o Contractor shall obtain and pay for all required permits, inspections, and approvals needed to perform the work in compliance with local/state building codes. o Contractor shall coordinate inspections and provide documentation of permit closure upon completion. C. Removal & Disposal o Remove existing metal roof panels, flashing, fasteners, ventilation components, and gutter system (downspouts to remain). o Dispose of debris off-site per environmental and local regulations. D. Substructure Assessment o Inspect decking/purlins and gutter mounting surfaces for damageInstallation of New Roof System o Install 24-gauge Galvalume metal panels. o Provide and install: Ridge caps, eave/rake trim, closure strips, drip edges High-temp synthetic underlayment Corrosion-resistant fasteners compatible with Galvalume Flashing at penetrations (vents/HVAC/ducting) o Ensure weatherproofing and proper water run-off alignment into the gutter system. F. Ventilation Components o Furnish and install necessary roof ventilation o Ensure ventilation is balanced and in accordance with manufacturer guidelines for metal roofing systems. G. Gutter System Replacement (Retaining Downspouts) o Remove existing gutters and replace with new gutters compatible with the new roof. o Existing downspouts to remain in place and be reused. o Work to include: Gutter hangers, brackets, straps, and hardware Proper slope for positive drainage Alignment and connection to existing downspouts H. Quality Assurance o Final inspection and joint/fastener/sealant check. o Confirm gutter-to-downspout fit and drainage. o Correct deficiencies prior to closeout. I. Cleanup o Remove all debris from worksite, created by contractors. o Return work area to original condition or better.

Final Planning

Transportation Terminals

$62,425.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

16

Subscribe For Documents

58 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
420
Active Projects
199
Bidding Soon
3,050
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2026

June 10, 2026

Project location map

3600 Drane Field Rd, Lakeland, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.