BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2026 at 8:00 PM

Updated May 20, 2026

Renovation of an educational facility in Fremont, California. Completed plans call for the renovation of a educational facility.

Question Deadline 03/19/2026 All questions about the meaning or intent of the Contract Documents are to be directed via email to the District to Adnan Taqui, adnan.taqui@cumming-group.com Questions received less than SEVEN (7) calendar days prior to the date for opening bids may not be answered. The Project will be phased according to the construction schedule included herein. Furnish all labor, supervision, materials, tools, equipment, and services required for the above-listed specification sections covering related work as per project plans and specifications and as described below. The Project consists of: MPR renovations and roofing work in MPR Buildings at Thornton Middle School. MPR renovations and roofing work in MPR Buildings at Thornton Middle School. To bid on this project, bidders must possess the appropriate State of California contractor's license(s): Bid Package A requires a C-39 Roofing license, Bid Package B requires a C-33 Painting license, Bid Package C requires a C-15 Flooring license, and Bid Package D requires a C-10 Electrical license. Bidders must be registered as a public works contractor with the Department of Industrial Relations. Only pre-qualified bidders may submit a bid. All bids must be submitted on the form provided by the district and must include a bid bond, cashier's check, or certified check in the amount of ten percent of the total bid price. Attendance at the mandatory pre-bid conference is required. The successful bidder must furnish a 100% Performance Bond and a 100% Payment Bond. The successful bidder will be required to meet the DVBE participation goal or show good faith effort, pay prevailing wages, comply with labor compliance monitoring, and agree to the Project Stabilization Agreement. The contract will be awarded to the lowest responsive responsible bidder based on the base bid amount only. The Board reserves the right to reject any and all bids and waive any irregularity in any bid received. No bidder may withdraw its bid for ninety days after the bid opening date. Pre-qualification requirements: Only pre-qualified bidders are eligible to submit a bid for this project. Interested bidders must submit prequalification packets as instructed by the District. Bid Result: Bid Package A - Roofing Trades: I & A Contractor Inc- $892,000.00 Bid Package B - General / Painting Trades : Gonsalves & Stronck Construction Company Inc. - $264,000.00 Bid Package C - Flooring Trades : All County Flooring - $88,467.00 Bid Package D - Electrical Trades: Bockmon & Woody Electric Co. Inc - $98,380.00

Bid Results

Educational

$1,342,847.00

Public - City

Renovation

55

15

8

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
527
Active Projects
286
Bidding Soon
3,645
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2026

May 25, 2026

Project location map

4357 Thornton Ave, Fremont, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.