BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published February 16, 2026 at 7:00 PM

Updated February 17, 2026

Site work and new construction of a pre-engineered storage facility in Aspen, Colorado. Completed plans call for the construction of a pre-engineered storage facility; and for site work for a pre-engineered storage facility.

Reference Number 0000412973 Pitkin County is qualifying interested parties for the provision of a Construction Manager / General Contractor at the Pitkin County Solid Waste Center located at 32046 Jack Gredig Lane, Aspen, CO 81611. This RFP is a direct result of the Pitkin County Solid Waste Center's plan to extend the life of the Solid Waste Center for the next 70 years. The first piece of that plan is to relocate infrastructure on the site to allow for the construction of a new landfill cell in 2027 / 2028. In 2024, the Pitkin County voters approved a ballot measure to allow the Solid Waste Center to issue bonds to construct the new infrastructure which led to the beginning of campus design. The design team of Weaver Consultants and HDR have worked to develop a cohesive campus that meets the current and future needs of the Solid Waste Center. The solicitation of a Construction Manager / General Contractor is desired to provide constructability input during the final aspects of design, create high level value engineering options, and continue the counties' collaborative approach to this project. Question Deadline 02/27/2026 at 4:00 PM MT Questions are submitted online No, Questions and requests for clarification will only be accepted via email at procurement@pitkincounty.com. Buyer Preferences, Guidelines & Requirements General Requirements - Contractors License Required - Installation Required - Insurance Required - License Required - Safety Standards Plan - Warranty Information Required Bonding Requirements - Performance Bond 50 %

GC Bidding

Warehouse / Distribution - Pre-Engineered Storage Building

$176,700.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
36
Bidding Soon
225
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 13, 2026

July 13, 2026

Project location map

485 Rio Grande Pl, Aspen, CO


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.