Published April 23, 2026 at 8:00 PM
Updated May 21, 2026
Demolition, site work and new construction of a bridge / tunnel in Wilton, New Hampshire. Completed plans call for the demolition of a bridge / tunnel; and bridge / tunnel.
The project generally consists of a bridge replacement that involves demolishing an old stone arch bridge, salvaging its stone, installing a new precast concrete bridge (arch superstructure, footings, and wingwalls), constructing a stone veneer to the wingwalls, reconstructing the roadway, and constructing historical mitigation. Question Deadline 03/13/2026 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than seven days prior to the date for opening of Bids may not be answered. To be added to the official list of plan holders, a prospective bidder must request electronic copies or purchase paper plans and specifications using the name that is to appear in the bid documents. The owner reserves the right to reject any and all bids, to waive any and all informalities not involving price, time, or changes in the work, and to negotiate contract terms with the successful bidder, and the right to disregard all non-conforming, non-responsive, unbalanced, or conditional bids. The owner also reserves the right to reject the bid of any bidder if the owner believes that it would not be in the best interest of the project to make an award to that bidder, whether because the bid package is non-responsive, or the bidder is unqualified or of doubtful financial ability, or fails to meet any other pertinent standard or criteria. Discrepancies in the multiplication of units of work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Engineer's Estimate: $1,000,000 - $1,200,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Post-Bid
Bridges / Tunnels
$1,200,000.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 20, 2026
May 1, 2026
King Brook Rd, Wilton, NH
Related To This Project
Wilton, NH
--
Wilton, NH
Bid Date: Oct 04 2024
Wilton, NH
--
Wilton, NH
Bid Date: Apr 19 2024
Wilton, NH
Bid Date: Apr 25 2024
Wilton, NH
Bid Date: Apr 19 2024
Wilton, NH
Bid Date: Apr 19 2024
Wilton, NH
Bid Date: Mar 15 2024
Wilton, NH
Bid Date: Mar 01 2024
Wilton, NH
--
Wilton, NH
Bid Date: Jun 21 2024
Wilton, NH
Bid Date: Jun 16 2023
Wilton, NH
Bid Date: May 11 2023
Wilton, NH
Bid Date: Apr 27 2023
Wilton, NH
Bid Date: Apr 27 2023
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.