BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 14, 2026 at 8:00 PM

Updated May 20, 2026

Site work for a civil project in Mount Holly, Vermont. Completed plans call for site work for a water / sewer project.

Bid Description: Improvements to the water system, including waterline installation via directional drilling method, water treatment building construction, hydropneumatic tank replacement, chlorine analyzer, Ion exchange system for radium, drywell for ion exchange backwash, 5-micron particle filters, telemetry controls improvements, dehumidification/air handling, booster pump replacement, and site improvements. This project is funded in part through the Vermont Drinking Water State Revolving Fund. Consequently, the following provisions apply to this WORK (more detail for each of these provisions can be found in Instruction to Bidders): 1. Bid security in accordance with the Instructions to Bidders. 2. Disadvantaged Business Enterprise (DBE) requirements. 3. Performance BOND and Payment BOND each in the amount of 100% of the contract price. 4. American Iron and Steel (AIS) provisions of P.L. 113-76, Consolidated Appropriations Act. 5. Federal Wage Rates as determined under the Davis-Bacon Act. 6. This agreement is for services related to a project that is subject to the Build America, Buy America Act (BABAA) requirements under Title IX of the Infrastructure Investment and Jobs Act ("IIJA"), Pub. L. 177-58. Absent an approved waiver, all iron, steel, manufactured products, and construction materials used in this project must be produced in the United States, as further outlined by the Office of Management and Budget's Memorandum M-22-11,Initial Implementation Guidance on Application of Buy America Preference in Federal Financial Assistance Programs for Infrastructure, April 18,2022. This Project has qualied for an Adjustment Period Waiver to BABAA for the entire Project. 7. Project Signage. 8. Notwithstanding #6 above, this project has obtained a waiver from BABAA requirements for all phases of this project.

Award

Water / Sewer

$685,953.00

Public - City

Site Work

11

24

15

7

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
192
Bidding Soon
2,265
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2026

April 9, 2026

Project location map

150 School St, Mount Holly, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.