BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 17, 2022 at 8:00 PM

Updated November 15, 2023

Site work for a bridge / tunnel in Mount Holly, Vermont. Completed plans call for site work for a bridge / tunnel.

CONTRACTNO. 1 The Project consists of replacing a 60-inch CMP culvert with a 12-foot W by 7-foot H by 30-foot L precast concrete box culvert. The Site of the Work includes property, easements, and designated work areas described in greater detail in the Contract Documents but generally located on Summit Road in the Town of Mount Holly. The Work will be substantially completed within 30 days after the Effective Date of the Contract and completed and ready for final payment within 45 days after the Effective Date of the Contract.

Award

Bridges / Tunnels

$231,832.00

Public - City

Site Work

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
248
Active Projects
115
Bidding Soon
1,760
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 13, 2022

February 14, 2022

Project location map

Summit Rd, Mount Holly, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.