Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 10, 2026 at 8:00 PM
Updated June 11, 2026
Site work and paving for a road / highway in Mount Holly, Vermont. Completed plans call for site work for a 11,000-square-foot road / highway; and road / highway.
Base Bid - Section 01 - Hortonville and Shunpike Rd Intersection - 11,000 sf - Shim and Overlay Paving at the intersection of Hortonville Road and Shunpike Road to the limits shown on the attached map. Base Bid - Section 2 - Portion of Hortonville Rd - 3,700lf - Asphalt Paving from Route 103 (start at edge of Route 103) to a point 3,700lf from start point, approximately 275lf beyond the Stop Sign at Old Turnpike Road Intersection (northside stop sign). Also pave roads - Widening (match existing) for Little Rd and Cole Rd; and Old Turnpike Road approximately 70 feet back from west side of intersection with Hortonville Rd (match existing end) and approximately 40 feet back from east side of intersection with Hortonville Rd (match existing end). See attached maps for limits. Please email questions to Clinton Wooley at mthollyroads@vermontel.net. QUESTIONS must be received by June 22nd at 3:00pm.
GC Bidding
Roads / Highways
$500,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 30, 2026
July 30, 2026
Hortonville Rd, Mount Holly, VT
Related To This Project
Mount Holly, VT
Bid Date: Mar 24 2026
Mount Holly, VT
Bid Date: Jul 08 2025
Mount Holly, VT
--
Mount Holly, VT
--
Mount Holly, VT
Bid Date: Jun 10 2024
Mount Holly, VT
Bid Date: Jan 13 2022
Rutland, VT
Bid Date: Jun 30 2026
Sheldon, VT
Bid Date: Jun 23 2026
Hartford, VT
Bid Date: Jun 30 2026
Burlington, VT
Bid Date: Jun 17 2026
Montpelier, VT
Bid Date: Jul 17 2026
Stockbridge, VT
Bid Date: Jul 02 2026
Barre, VT
Bid Date: Jun 18 2026
Barre, VT
Bid Date: Jun 18 2026
Barre, VT
Bid Date: Jun 18 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
