BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 9, 2026 at 8:00 PM

Updated May 15, 2026

Site work for a bridge / tunnel in Seattle, Washington. Completed plans call for site work for a bridge / tunnel.

Requires replacing roofing of the towers, windows, watertight doors, access doors, stainless steel ladders, valves, and removing northwest control tower's top two floors on BR 99/530E in addition to replacing the roofing on the control tower of BR 99/530W, traffic control and other work. Involves 30 items and 63 working days. Work class 6, bridges and structures. Estimated value $1,000,000 - $1,250,000 WA DOT - SR 99, 1st Ave S Bridge Tower Mit & Watertight Door Replacement *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$2,316,255.00

Public - State/Provincial

Site Work

38

15

27

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
199
Active Projects
82
Bidding Soon
1,167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2026

June 22, 2026

Project location map

1st Ave S, Seattle, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.