Site work for a water / sewer project in Pilot Point, Texas. Completed plans call for site work for a water / sewer project.
*As of April 14, 2026, the CMAR has already announced their proposed awarded contractor for this work package, and they are expecting to officially award this contractor either at the end of this week or early next week. Project construction is estimated to start in Q3 2026. This work package includes furnishing and installing complete Electrical and Instrumentation & Controls (I&C) systems in accordance with the Contract Documents. Key elements include: all labor, materials, equipment, and supervision necessary for installation per plans and specifications; Prime Controls, LP, to provide I&C programming and commissioning; furnish and install a security system with all components, programming, testing, and commissioning; coordinate all activities with the CMAR and other contractors; provide and maintain temporary electrical power for the jobsite and trailer connections, removing these at project completion; furnish a Roll-Off Mover (Rolloffcaddy) or approved equal; furnish, install, and commission a 1,750 kW generator with all required systems and maintenance; furnish, install, and test Variable Frequency Drives (VFDs) at specified locations; obtain and coordinate all required permits and inspections for power installations; perform startup, testing, commissioning, and operator training for all systems and equipment; restore disturbed areas and use the Borrow Area for backfill or disposal of clean spoils as permitted. Exclusions: Blowers with VFDs and harmonic filters (provided under Work Package #05). No alternates specified. Question Deadline 03/06/2026 at 5:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via online.
Bid Results
Water / Sewer
$3,000,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2026
July 6, 2026
N St James Rd, Pilot Point, TX
Related To This Project
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: May 07 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.