Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 14, 2026 at 8:00 PM
Updated May 20, 2026
Site work for a water / sewer project in Pilot Point, Texas. Working plans call for site work for a water / sewer project.
*As of April 14, 2026, their were No bids/responses received by the CMAR for this Work Package. There is a possibility that this Work Package might go back out for rebid. Project construction is estimated to start in Q3 2026. This Work Package includes development, implementation, maintenance, compliance, monitoring, and closeout of the Stormwater Pollution Prevention Plan (SWPPP) and all associated Best Management Practices (BMPs) for the duration of the Project. Scope includes full development, design, implementation, inspection, maintenance, and compliance of the SWPPP and all erosion and sediment control BMPs. This encompasses all labor, materials, equipment, fees, permits, inspections, documentation, compliance actions, fines, and incidentals required by the contract, specifications, and regulations. BMPs are to be inspected regularly and repaired or replaced within forty-eight hours of identification or notification. Continuous SWPPP and BMP services must be provided from Notice to Proceed through Final Acceptance. Additional requirements include furnishing and maintaining the initial construction entrance and vehicle access in accordance with contract documents, installation and maintenance of a concrete washout pit, preparation and submission of weekly reports on BMPs and SWPPP status, and obtaining all permits and regulatory approvals. No exclusions or alternates specified. Question Deadline 03/06/2026 at 5:00 PM CT All questions about the meaning or intent of the Contract Documents shall be received in writing via Online.
Final Planning
Water / Sewer
$500,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2026
July 6, 2026
N St James Rd, Pilot Point, TX
Related To This Project
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
Bid Date: Mar 18 2026
Pilot Point, TX
--
Pilot Point, TX
--
Pilot Point, TX
Bid Date: Feb 10 2026
Pilot Point, TX
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
