Published March 30, 2026 at 8:00 PM
Updated March 31, 2026
Site work for a development in La Porte, Indiana. Completed plans call for site work for a development.
Work to be performed includes furnishing all labor, equipment, and materials for the improvement of street, and all other work shown and specified in the Contract Documents. The site of construction is at an existing stormwater pond on Boyd Boulevard, portions of Boyd Boulevard and Lincoln Highway, and Darlington Street, within the City of LaPorte, Indiana. Bids must be on the Bid Form contained in the Specifications. maintaining traffic, lincolnway (sr2), open cut, maintaining traffic, boyd blvd, common excavation, deliver to city site, curb and gutter, concrete, remove and replace, hma patching, type b, hma surface, type b, 9.5 mm, hma intermediate, type b, 19.0 mm, hma base, type b, 25.0 mm, pccp base, patching, concrete patching , mulched seeding, no mow seed mixture, mulched seeding, no mow seed mixture, manhole, type e-4, install only, reventment rip rap on geotextile, watermain, linestop, 18 in. , watermain, connect to existing Each bidder must also complete a Form 96 (as prescribed by the State Board of Accounts); an executed non-collusion affidavit; signed copies of addenda (if issued); a completely executed Affidavit of Compliance with Indiana Immigration Law and Certification of Not Being Engaged in Investment Activities in Iran; and satisfactory bid security as set forth in the Contract Documents. All bids must be accompanied by a certified check or bid bond in the amount of 5% of the Bid. No bidder may withdraw his bid within 60 days after the actual date of the opening thereof. The Redevelopment Commission reserves the right to reject any or all bids, or to accept a full or partial award of the bid, which, in its judgment, will be to the best interests of the City of LaPorte. MBE (18.4%), WBE (6.9%) a. Lane Restriction Days: 45 - (On Lincolnway/SR 2) b. Substantial Completion Date: June 30, 2026 - (Completion of all pipe and roadway work) c. Final Completion Date: September 1, 2026
Award
Conservation and Development
$5,349,750.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 17, 2026
May 12, 2026
Multiple Locations, La Porte, IN
Related To This Project
La Porte, IN
Bid Date: Mar 27 2026
La Porte, IN
--
La Porte, IN
Bid Date: May 26 2026
La Porte, IN
Bid Date: May 29 2026
La Porte, IN
--
La Porte, IN
Bid Date: Mar 20 2026
La Porte, IN
Bid Date: Apr 01 2026
La Porte, IN
Bid Date: Feb 11 2026
La Porte, IN
Bid Date: Dec 09 2025
La Porte, IN
Bid Date: Dec 05 2025
La Porte, IN
Bid Date: Nov 25 2025
La Porte, IN
Bid Date: Nov 20 2025
La Porte, IN
Bid Date: Nov 11 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.